My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00047
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00047
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:04 AM
Creation date
10/5/2006 11:32:41 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153490
Contractor Name
Union Avenue Boat Chute 1987
Contract Type
Miscellaneous
Water District
0
County
Arapahoe
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />EXECUTIVE SUMMARY <br /> <br />-7- <br /> <br />In-chute operation and maintenance of the boat chute should remain under <br />the jurisdiction of the CWCB. The annual budget for this agency should <br />contain a line item for South Platte River maintenance under the annual <br />construction fund. The eWCB should then contract with the UD&FCD to <br />perform the actual maintenance work. Additional funding might be available <br />through the UD&FCD for maintenance based on annual priorities. <br /> <br />Adjacent land O&M would be appropriately placed with the City of Englewood <br />and the South Suburban District. <br /> <br />Alternative No. 4 requires less than an acre of land acquisition, while <br />Alternative No. 5 requires limited land access of up to approximately two <br />acres. In the event that it was a desire of the governmental agencies <br />involved to provide for an impetus for future area economic development, <br />additional land should be considered; but this is not vital to the <br />completion of Alternative Nos. 4 or 5 as described. <br /> <br />It is anticipated that a 404 permit will be required for either <br />alternative; however, alternative No. 5 will reqUire more detail because of <br />the old Oxbow involvement in the lower portion of the boat chute. This is <br />not considered to be a problem. <br /> <br />The estimated operation and maintenance cost is approximately $9,400 per <br />year, including both in-chute and adjacent land maintenance. <br /> <br />GENERAL <br />This feasibillty report is judged to be adequate for the following <br />purposes. <br /> <br />1. Judging of the economic feasibillty of constructing a boat chute <br />at Union Avenue dam. <br />
The URL can be used to link to this page
Your browser does not support the video tag.