Laserfiche WebLink
<br />~ <br /> <br />. <br />, TECHNICAL MANPOWER AND ENGINEERING COST ESTIMATE <br />The estimated manpower required for the various work tasks (see <br />Study Methodology) are presented in the fOllowing table. <br />The engineering cost estimate for this study, based upon the proposed <br />scope of work and the hourly charge rates for the various technical <br />categories, as defined on Table II, enclosed, would be $9,800. Direct <br />costs for report printing and travel expenses between Nunn and Denver are <br />also included. <br />We would prefer the reimbursement method for the engineering services <br />on this study be based upon the actual time expended to perform the specified <br />study tasks at an established hourly rate, with the provision that certain <br />budgeted costs not be exceeded without prior approval.' <br /> <br />. <br /> <br />I <br /> <br />" <br /> <br />I <br /> <br />I <br />1 <br /> <br />, <br />, <br /> <br />I <br />] <br /> <br />I <br /> <br />1 <br /> <br />] <br />I <br />I <br />, <br />] <br /> <br />J <br /> <br />. <br />