Laserfiche WebLink
<br />I <br /> <br />. <br /> <br />. <br /> <br />~ <br /> <br />~ <br /> <br />STUDY TEAM <br />The study would be conducted under the general direction of <br />Ronald L. Halley, P.E., President of Hydro-Triad, LTD. Kenneth A. Mangelson, <br />P.E., and Senior Engineer would manage the project and be assisted by the <br />staff engineers, Curtis W. Miller, P.E., and William P. Ruzzo, P.E., as <br />required~ The professional resumes for these team members are included <br />for review in the following pages. If local assistance is needed for survey <br />or field measurements for mapping, we would anticipate that the town staff <br />may be able to provide some of this data. If town manpower is unavailable <br />for this work, we can provide the capability for obtaining field surveys. <br />The manpower estimate included herein does not include manpower for field <br />survey work, since the current system mapping as developed by the town <br />appears to be adequate for the feasibility study. <br /> <br />. <br /> <br />I <br />I <br /> <br />~ <br />" <br /> <br />I <br />I <br /> <br />I <br /> <br />. <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br />... <br /> <br />I <br /> <br />. <br />