My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00046
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:04 AM
Creation date
10/5/2006 11:32:41 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153163
Contractor Name
Nunn, Town of
Contract Type
Grant
Water District
0
County
Weld
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />:. <br /> <br />:. <br /> <br />I <br /> <br />F. Water Quality Evaluation <br />This work task will consist of evaluation of the water quality data <br /> <br />" <br /> <br />I <br /> <br />.,; <br /> <br />derived from the various sources and including some additional tests that <br /> <br />I <br />I <br /> <br />may be necessary. The evaluation will address the water quality aspects as <br /> <br />it affects projected facilities or water service in relationship to what type <br /> <br />of treatment and related costs would be required for potable use. Particular <br /> <br />OJ <br />:.! <br /> <br />attention will be focused on the nitrate problem. The state and federal <br /> <br />I <br />I <br /> <br />water quality standards will be utilized as objective norms for the potable <br /> <br />water service. This work item will be coordinated closely with the source <br /> <br />evaluation. <br /> <br />G. Economic and Financial Evaluation <br /> <br />.~ <br /> <br />Thi s work item will consi st of the e,va 1 uati on of any proposed <br /> <br />improvement costs and will include the operat.ion, maintenance, and replacement <br /> <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br />costs. The amount required for an emergency operating fund will also be <br /> <br />.established based upon the guidelines of the CWCB. In addition, the ability <br /> <br />of the town to reimburse the CWCB for any construction funds will be <br /> <br /> <br />detennined from the financial data provided by the town. <br /> <br />H. Feasibility Report <br /> <br />The feasibility report on the water supply system for Nunn will provide <br /> <br />I <br /> <br />information or results of analysis.on the f01lowing items: <br /> <br />I <br /> <br />I. General Information and Background <br />II. Town of Nunn Charter - Financia"l Status and Water System Assets <br />III. Service Area and Population Deloineation and Description, <br />Water Demands, present and futul"e. <br />IV. Water Supply <br />1. Sources <br />2. Quality and Treatment <br />3. Distribution System <br />4. Fireflow demand <br />5. Storage Requirements <br />V. Water Rights <br />VI. Plan of Development <br />1. Preliminary Design <br />2. Construction Phasing <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.