My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00044
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:04 AM
Creation date
10/5/2006 11:32:36 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0011X
Contractor Name
Cotton Creek Water Company
Contract Type
Loan
Water District
0
County
Moffat
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1348.98 ac-ft for 1994, 1995 and 1996 respectively. 1600 acres <br />are irrigated with the Cotton Creek Airline Ditch water right. <br />The State Engineer's Office Annual Water Diversion reports for <br />1994, 1995 and 1996 are found in Appendix E. <br /> <br />Cost Estimate <br /> <br />Either of the selected alternatives is estimated to cost <br />approximately $200,000. Design will be completed by NRCS staff. <br />The construction cost estimate for the concrete ditch option, <br />including contingencies, was provided by VSL Construction and is <br />included in Appendix D. <br /> <br />Item <br /> <br />Estimated Cost <br /> <br />1. Mobilization <br /> <br />$ 14,000.00 <br /> <br />2. 13,200 lineal feet of <br />concrete lining <br /> <br />Total <br /> <br />$191,400.00 <br />$205,400.00 <br /> <br />Note: Subtract $1.00/foot if screening can be eliminated <br />and a scraper used. Owner is to furnish earth for the pad. <br />There is estimated to be approximately 5,000 yards of earth <br />for the ditch pad within scraper haul distance. The scraper <br />is charged at $100.00/hour with operator to move dirt. <br /> <br />Implementation Schedule <br /> <br />The following schedule is proposed for implementation of the <br />project: <br /> <br />Task <br />1. Complete Final Design <br />2. NRCS Approves Design <br />3. Start Construction <br />4. Complete Construction <br />5. Project is Operational <br /> <br />Tarqet Completion Date <br />6/15/97 <br />7/15/97 <br />8/15/97 <br />9/15/97 <br />9/15/97 <br /> <br />Social, Economic, and Physical Impacts <br /> <br />The project will have no significant social impacts. <br /> <br />The project will have a positive economic impact by providing <br />additional irrigation water for 1600 acres. S Bar C Farms will <br />have enough water in low water years to adequately irrigate their <br />crops. <br /> <br />Feasibility of Rehabilitation of the <br />Cotton Creek Airline Ditch <br />March 1997 <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.