My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00043
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2010 3:54:01 PM
Creation date
10/5/2006 11:30:50 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150100
Contractor Name
East Dillon Water District
Contract Type
Loan
Water District
5
County
Summit
Bill Number
Bill 02-1152
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />C\YCB Construction Fund Loan Application <br /> <br />Water Right: <br /> <br />CFS. <br /> <br />Average water diverted per year: <br /> <br />acre-feet. <br /> <br />6. Will the acquisition of additional water rights be necessary? YES <br /> <br />If YES. please explain. <br /> <br />NO X <br /> <br />NAME <br /> <br />7. Please list the names and addresses of the Applicants' engineer(s) and attomey(s). <br /> <br />ADDRESS and PHONE <br /> <br />See attached list <br /> <br />8. List any feasibility studies or other investigations that have been completed or are now in <br />progress for the proposed project. Please submit one copy of each completed study with this <br />application. 1998 Water System Master Plan by Sew'.Brown Group <br /> <br />/998 rVater Swdy by Bishop-BroJl,den Associates <br /> <br />9. Estimated cost of the project. <br />construction costs. if knO\\n. <br /> <br />Estimated Engineering Costs: <br /> <br />Estimated Construction Costs: <br /> <br />Estimated Total Costs: <br /> <br />Please include estimated engmeenng costs. and estimated <br /> <br />$ <br />$ <br />$ 3.400,000 <br /> <br />10. Loan anlOunt and terms you are requesting. <br /> <br />Requested Loan Amount: <br />Term (length) of loan: <br />Interest Rate: <br /> <br />$ 2,550,000 <br /> <br />20 <br /> <br />4.15 <br /> <br />(UsuaJJ~' 75% of Estimaled Total Co~"ts) <br /> <br />years (Usually 10.20. or 30 )c:arsl <br /> <br />% (please call for our current ratesl <br /> <br />rut c. ~ Project Sponsor Financial Information <br /> <br />Because the eWCR Construction Fund is a revolving fund. it is important that the project sponsor <br />have the financial capacity to repay any loans made by the CWCB. The follO\\ing infomlation is <br />needed to assist the CWCB in a preliminary assessment of the applicant's financial capacity. It is <br />also requested that the project sponsor submit \\;th this application copies of the two most rt.'cent <br />annual reports. financial statements. corporate reports or other current documentation of <br />financial condition and operations. <br /> <br />I. List any existing liability or indebtedness that exceeds one thousand dollars. For example. bank <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.