Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Table 5 <br />Illustration of <br />\V..ler Ri~hls Allocation <br />East Dillon \Vater District <br />(llcrc-fccl) <br /> <br /> Water Rights <br />Month Projected Rice Valaer Storage Total <br /> Deoletion <br />November 1.4 1.4 1.4 <br />December 1.6 1.6 1.6 <br />January J.7 J.7 J.7 <br />February 1.5 1.5 1.5 <br />~farch 1.8 1.8 J.8 <br />April 1.6 .8 .8 1.6 <br />May 2.6 2.6 2.6 <br />June 7.8 3.9 3.9 7.8 <br />July 9.6 4.8 4.8 9.6 <br />August 4.5 2.3 2.2 4.5 <br />September 3.1 3.1 3.1 <br />October 1.4 1.4 1.4 <br />Total 38.5 19.8 14.3 4.5 38.5 <br /> <br />The use of the rights is also illustrated generally in Table 6 below. Rice Ranch rights are available <br />on a year.round basis. The Valaer Ditch rights are available throughout the year. as described in the <br />"Property to be Purchased" section abo\"C. and the Columbus Ditch rights arc available June through <br />September. <br /> <br />-17- <br /> <br />I 8hbop.HnI~lkll.l\"I(.klft." JIIC <br />