My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00036
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:04 AM
Creation date
10/5/2006 11:30:31 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153533
Contractor Name
Santa Maria Reservoir Company
Contract Type
Loan
Water District
0
County
Hinsdale
Bill Number
SB 88-30
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />... <br /> <br />a. Surficial Geology and Geotechnical Inspection <br /> <br />~ <br /> <br />The Santa Maria Oam site inspection and surficial mapping was con- <br />ducted by Dr. Charles Robinson, R. L. Halley and M. F. Winter. The <br />inspection effort provided definition of drill hole locations and <br />depths as well as details of a sampling and testing program. In <br />addition, the extent of the geophysical program was determined. <br /> <br />.... <br /> <br />"III <br /> <br />~ <br /> <br />i <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />The drilling program consisted of three vertical holes. Two ver- <br />tical holes near the right abutment extendi ng from the embankment <br />crest through the core zone and one vertical hole primarily in abut- <br />ment rack were proposed. Standard Penetration Tests, soil sampl i ng, <br />and fi E!l d 1 oggi ng were pl anned for the two embankment holes. Core <br />drilling and permeability testing were to be done for the abutment <br />hole. Standpipe piezometers were to be installed in each hole upon <br />completion of sampling and testing. <br /> <br />The geophysical program wa~ defined to include electromagnetic <br />(EM), self-potential (SPl, and ground-penetrating radar (GPR) pro- <br />filing concentrated in the right abutment area. Figure V-2 shows the <br />location of geophysical surveys. <br /> <br />The GPR profiling was included because close inspection of <br />1909-1913 construction photos (~hich are included in Appendix F) pre- <br />served by the Santa Maria Reservoir Company reveal ed exi stence of a <br />concrete and wood decant structUre near the right abutment contact. A <br />decant structure is often used in hydraul i c fill and mi ne ta il i ngs <br /> <br />v - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.