Laserfiche WebLink
<br />. <br /> <br />ADDENDUM (Continued) <br /> <br />Comparison of 1981 and 1983 <br />estimated costs and benefits for <br />Plan 9 (M&I Water Plan) <br />January 1981 <br />price levels <br /> <br />. <br /> <br />construction costs <br />Multipurpose facilities <br />Power facilities <br />Municipal and industrial <br />facilities <br />Recreation facilities <br />Wildlife facilities <br />Cultural resource programs <br />Permanent operating facilities <br />Total construction costs <br />Interest during construction <br />(6-year construction period <br />at 7.875 percent) <br />Total investment <br />Annual equivalent cost <br />Amortized investment (100 years <br />at 7.875 percent) <br />Operation, maintenance, and <br />replacement costs <br />Power <br />Colorado River Storage Project <br />depletion charge <br />Total <br />Annual benefits <br />Baseload power <br />Municipal and industrial <br />Recreation <br />Fish and wildlife <br />Flood control <br />Total <br />Benefit-cost ratio <br /> <br />January 1983 <br />price levels <br /> <br />$288,300,000 <br />29,435,000 <br /> <br />$297,000,000 <br />32,508,000 <br /> <br />16,200,000 <br />22,725,000 <br />17,900,000 <br />650,000 <br />90,000 <br />375,300,000 <br /> <br />17,892,000 <br />25,500,000 <br />19,490,000 <br />720,000 <br />101,000 <br />393,211,000 <br /> <br />104,400,000 <br />479,700,000 <br /> <br />117 ,000,000 <br />510,211,000 <br /> <br />35,407,000 <br /> <br />894,000 <br />67,000 <br /> <br />40,200,000 <br /> <br />1,160,000 <br />67,000 <br /> <br />502,000 <br />36,870,000 <br /> <br />502,000 <br />41,929,000 <br /> <br />9,169,999 <br />28,756,000 <br />3,519,000 <br />1,494,000 <br />6,000 <br />42,944,000 <br />1.16: 1 <br /> <br />10,725,000 <br />32,339,000 <br />3,936,000 <br />1,475,000 <br />7,000 <br />48,482,000 <br />1.16: 1 <br /> <br />2. The number of hours of generation of the powerplants on a daily basis <br />is shown below. <br /> <br />Plan 3 (Peaking Power Plan) <br />Baseload powerplant <br />Peakload powerplant <br />Plan 9 (M&I Water Plan) <br />Baseload powerplant <br /> <br />. <br /> <br />Plant <br />factor <br /> <br />Average <br />operation <br />per day <br />(hours) <br /> <br />0.865 <br />.237 <br /> <br />20.8 <br />5.7 <br /> <br />.504 <br /> <br />12.1 <br /> <br />2 <br />