My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00034
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00034
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:04 AM
Creation date
10/5/2006 11:30:11 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153275
Contractor Name
Palisade Irrigation District
Water District
0
County
Mesa
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />non-federal entities. costs of operation and maintenance to the <br /> <br /> <br />extent that such costs exceed the expenses which would have <br /> <br /> <br />been incurred absent the unitls construction; and <br /> <br />WHEREAS. the Contractor is an irrigation distric~ organized <br />pursuant to articles 41. 42. and/or 43 of title 37, Colorado <br />Revised Statutes. which furnishes irrigation water to its users <br />through headgates on its main canales), such water thereafter <br />flowing through a system of private laterals which are <br />currently owned and operated by numerous private individuals or <br />informal groups and associations; and <br /> <br />WHEREAS. the Secretary. acting through the United States <br />Bureau of Reclamation (Reclamation). is requiring that the <br />laterals be organized into entities enabled by the laws of the <br />State of Colorado with which it can contract for the long-term <br />operation and maintenance of the improved laterals; and <br /> <br />WHEREAS. the State. acting through the Colorado Water <br />Conservation Board (Board). has solicited the Contractor to be, <br />and the Contractor is willing to become, the non-federal entity <br />which will acquire such real property interests in the laterals <br />under its canal system as will enable it to contract with <br />Reclamation for the long-term operation and maintenance of the <br />improved laterals; and <br /> <br />WHEREAS. the Contractor must first conduct a review of its <br /> <br /> <br />legal authorities and accounting procedures and negotiate with <br /> <br /> <br />Reclamation a contract(s) lias to formu for the long-term <br /> <br /> <br />operation and maintenance of the improved laterals (said <br /> <br /> <br />activities hereinafter being referred to as IIStage II <br /> <br /> <br />activitiesll); and <br /> <br />WHEREAS. the State and Reclamation desire that the <br />Contractor undertake these Stage II activities: and <br /> <br />Page I of 10 Pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.