My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00032
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:29:56 AM
Creation date
10/5/2006 11:30:07 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153465
Contractor Name
City of Cortez and Dolores Water Conservancy District
Contract Type
Loan
Water District
71
County
Dolores
Bill Number
HB 83-1102
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />2-2 <br /> <br />4. Selection of the most suitable pipeline material for a new <br />pipeline. <br /> <br />5. Determination of the feasibility of a hydroelectric power <br />generating system and recommended course of action. <br /> <br />6. Establishment of survey control and topographic mapping for <br />the selected pipeline corridor. <br /> <br />7. provision of a geotechnical analysis along the selected <br />pipeline corridor. <br /> <br />The feasibility analysis provides the basis for the recommend- <br />ation of pipeline size, material, alignment, and hydroelectric power <br />generation feasibility. This report presents the data and study <br />methodology used in the investigation and summarizes the findings, <br />conclusions, and recommendations. <br /> <br />BROWN AND CALDWELL C <br /> <br />CONSULTING ENGINEERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.