Laserfiche WebLink
<br /> I <br /> I <br /> I LIST OF TABLES <br /> I Table Page <br /> I 1-1 Average Monthly Mean Temperatures and <br /> Total Monthly Precipitation at Rifle, <br /> Colorado 1-4 <br /> I 1V-l Residential Per Capita Consumption <br /> Rates - GPCD 1V-l <br />, I 1V-2 M & I Water Supply Requirements for the <br /> South Rifle Division 1V-2 <br /> I 1V-3 Monthly Water Diversion Requirements 1V-4 <br /> 1V-4 First Stage System Peak Demand Rates (1990) 1V-5 <br /> I 1V-5 Recorded Flows on Colorado River <br /> Below Glenwood Springs 1V-7 <br /> I 1V-6 ~iversions by 185 CFS West Divide <br /> Project Right 1V-9 <br /> I 1V-7 West Divide Project Water Rights 1V-12 <br /> IV-8 Summary of Water Quality Data for the <br /> I Colorado River in the Vicinity of Rifle 1V-14 <br /> V-l Grit Chamber Design Criteria V-5 <br /> I V-2 Package Water Treatment Plant - Hydraul i c <br /> Design Criteria V-6 <br /> I V1-l Estimated Capital Cost of the South <br /> Rifle Division - First Stage V1-2 <br /> I V1-2 Annual Operation, Maintenance, and Re- <br /> placement Costs and Cost of Purchasing <br /> Augmentation Water VI-4 <br /> I VII-l Amortization Schedule for West Divide <br /> Project - South Rifle Division VII-3 <br /> I <br /> I <br /> I iii <br />