Laserfiche WebLink
<br /> I <br /> I <br /> I TABLE VI-l <br /> ESTIMATED CAPITAL COST <br />I I OF THE SOUTH RIFLE DIVISION -- FIRST STAGE <br /> Item Unit Total <br /> I No, Unit Quantity Price Amount <br /> 1. Care and Handling of River <br /> I for Construction of Intake LS $ $ 5,000 <br /> 2. River Intake Structure and <br /> Sediment Excluder - 1.56 cfs LS 23,100 <br /> I <br /> 3. River Pumping Station - <br /> 700 gpm LS 17,000 <br /> I 4. Package Water Treatment <br /> Plant - 1,0 mgd LS 456,000 <br /> I 5. Treated Water Pumping <br /> Station - 700 gpm LS 65,000 <br /> I 6. Treated Water Storage Tank <br /> - 1.0 mg LS 210,000 <br /> I 7. Intake Pipeline - 16" RCP LF 50 18.00 900 <br /> 8. Ductile Iron Water Trunk <br /> I Pipeline, 8", Cl, 150 LF 2,300 17.80 40,940 <br /> 9. Ductile Iron Water Trunk <br /> I Pipeline, 14", Cl. 150 LF 2,100 32.00 67,200 <br /> 10. Jacking Sleeve for Trunk <br /> Pipeline Under Interstate 70 LF 180 140.00 25,200 <br /> I 11. PRY Installation - 8" Ea 1 3,000.00 3,000 <br /> I Subtotal - Listed Items $ 913,340 <br /> Allowance for Unlisted Items <br /> I and Construction Contingen- <br /> cies @ 20%+ 182,660 <br /> I TOTAL CONSTRUCTION COST (7/80) $1,096,000 <br /> I <br /> I VI-2 <br />