My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00030
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:04 AM
Creation date
10/5/2006 11:30:04 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153325
Contractor Name
West Divide Water Conservancy District
Water District
0
County
Garfield
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />'I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />'I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Regional Flood are shown on the Project Map, The Corps of Engineers <br />study for the Rifle area was made prior to construction of Inter- <br />state Highway 70 through the area. However, it was assumed that the <br />culverts and other cross-drainage structures under the 1-70 roadway <br />as well as the South Rifle road underpass would permit the flood to <br />essentially cover the same area as defined in the flood study. <br /> <br />The river intake structure would be designed to be overtopped and <br />submerged in event of a flood. The operating floor of the river <br />pumping station and grit chamber would be set above the 100-year <br />flood level. The water treatment plant and the treated water pumping <br />station would be floodproofed by filling the site to raise the surround- <br />ing grade above the lOO-year flood level and protecting the embankment <br />from erosion, <br /> <br />V-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.