My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00030
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:04 AM
Creation date
10/5/2006 11:30:04 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153325
Contractor Name
West Divide Water Conservancy District
Water District
0
County
Garfield
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />II <br />, I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Table IV-3 gives the monthly distribution .of the water supply demand <br />which was adopted for this study for the South Rifle Division. <br /> TABLE IV-3 <br /> MONTHLY WATER DIVERSION REQUIREMENTS <br />Monthly Requirements Monthly Service Area Requirement <br /> (% of Total First Stage-1990 Ultimate - 2025 <br />Month Annua 1 Demand) Avg. mgd Total AF Avg. mgd Tota 1 AF <br />January 6.4 0.25 24 0,72 68 <br />February 6.0 0.26 23 0.74 64 <br />March 6,6 0.26 25 0,74 70 <br />April 7.3 0.30 27 0,84 77 <br />May 9,3 0.37 35 1.04 99 <br />June 11.5 0.47 43 1. 33 122 <br />July 12,2 0.48 46 1.36 130 <br />August 11.6 0.46 44 1. 30 123 <br />September 9.2 0,38 35 1. 06 98 <br />October 7.4 0.29 28 0.83 79 <br />November 6.3 0.26 24 0.73 67 <br />December 6.2 0,25 23 0.69 66 <br />Tota 1 100.0 0.34 377 0.95 1,063 <br /> <br />8ased on judgment and our past experience in areas similar to the <br />South Rifle Division, the residential peak demand ratios shown in <br />Table IV-4 were adopted for the purposes of this study. The <br />commercial peak hour and peak day ratios shown in Table IV-4 were <br />taken from the P. U. D. application for the Southside Center. <br /> <br />IV-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.