My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00029
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:04 AM
Creation date
10/5/2006 11:30:04 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153643
Contractor Name
Morgan County Quality Water District
Water District
0
County
Morgan
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />. <br /> <br />. <br /> <br />Mr. Morton W. Bittinger <br />June 18, 1975 <br />Page three <br /> <br />"valves". <br />''valves''. <br /> <br />18. Page 12. Third line from bottom, first word should be <br />Page 13. ,First line from top, fifth word should be <br />Also line 21 from top, seventh word should be "compared". <br /> <br />19. Geologic investigations. Refer in the text to the <br />Appendix where estra information is available and please make sure the <br />cross references in the report in general are better. Cross section <br />of geologic formations on page 16 of the Appendix could also give the <br />geologic formations and have. them identified. <br /> <br />20. Page 13. <br />office) may be helpful <br />in the future. <br /> <br />A flood map (data and maps available from our <br />in general construction and design activities <br /> <br />21. Design. Please provide whatever is necessary as required <br />by 6(c), 8, 9 & 10 of CWCB Guidelines. . <br /> <br />22. Paf,e 14, second line from top, word "Underground" could <br />be added before 'crossings". Also, seventh line from top, fifth word <br />should be "principal". <br /> <br />23. Page 14. Under "Rights-of-way," "stock water" is mentioned. <br />Is this stock water demand in the water use analysis? <br /> <br />24. Page 15. It appears the cost estimate does not include <br />anything for 0.1 million gallon tank; also nothing for 15", 10" and <br />2" valves. Also not included 4 wells with houses and controls and <br />automatic controls for reservoir levels. <br /> <br />25. Page 18. Please indicate how many people were polled and <br />if this polling is considered representative of the whole rural com- <br />munity. It is thought that such polling should be carried.out at the <br />earliest possible occasion and the results included in the report. <br /> <br />26. Page 18. After $69.60 per month present costs, how was <br />the $35.00 per month arrived at and is it a representative figure? <br /> <br />27. Page 20. Please establish the maximum the mural areas <br />could pay by utilizing data available. <br /> <br />28. Page 21. Total cost of water per 1,000 gallons should <br />be footnoted. <br /> <br />29. Page 21. It would be preferable if the Financial Program <br />Table includes all 40 years. <br /> <br />The following comments refer to the Appendix: <br /> <br />30. In the "List of Tables" preceeding page 1, it would be <br />helpful if we could indicate in which alluvium each well is located. <br /> <br />31. For Figure 1, same comment as comment 2. <br />
The URL can be used to link to this page
Your browser does not support the video tag.