My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00029
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:04 AM
Creation date
10/5/2006 11:30:04 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153643
Contractor Name
Morgan County Quality Water District
Water District
0
County
Morgan
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />. <br /> <br />Mr. Nick C. Ioannides <br />November 11, 1974 (Revised Dec. 30, 1974) <br />Page 2 <br /> <br />. <br /> <br />estimate of the approximate life of the proposed water supply, both in <br />terms of quantity and quality, will be presented along with methods of <br />arrlvlng at the estimate. In addition, the legal status of the proposed <br />water supply will be discussed. <br /> <br />Water requirements. Estimates of water requirements to serve the pro- <br />posed service area will be presented, alocg with the basic assumptions which <br />went into making the estimates. <br /> <br />Plan for development. The proposed .ystem will be presented including <br />pumping plants, pipe distribution system and storage facilities. Design <br />criteria for sizing these facilities will be set forth. A discussion of <br />right-of-way needs will also be included. <br /> <br />Estimated costs. Cost estimates will be presented for (1) construction <br />costs, (2) water costs, (3) legal and engineering costs and (4) annual costs <br />for operation, maintenance, replacement ar.d emergency reserve fund. The <br />cost estimates will be based upon current prices with projected price increase <br />percentages and contingency factors where considered necessary to assure <br />adequate funding. <br /> <br />Proiect evaluation. A determination of the necessary tap fees and water <br />rates will be made based on the cost estimate. These will be compared with <br />actual costs now being experienced for water-softening equipment and supplies <br />caused by the low-quality water being used. The estimated assessed valuation <br />of the area within the proposed district \dll be presented. <br /> <br />Financial program. <br />including estimated tap <br />costs, debt service and <br /> <br />Annual budgets will be presented for a 20-year period <br />fee and water salE,s income, operation and maintenance <br />emergency reserve fund deposits. <br /> <br />Environmental impact study report. As a separate document, an environ- <br />mental impact study report will be prepare,d for this project. <br /> <br />We estimate that our total fees for c.ompletion of the above work will <br />be $13,663, of which $5483 has already been paid by the Morgan County Quality <br />Water Association. <br /> <br />If you have any questions on the above, please feel free to call. <br /> <br />Sincere,ly yours, <br /> <br />MWB:js <br />cc: Paul McDill <br />Robert Samples <br /> <br />M. W. BITTINGER & ASSOCIATES, INC. <br /> <br /> <br />ft:'::f9'~'"' <br />
The URL can be used to link to this page
Your browser does not support the video tag.