My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00027
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:17:44 AM
Creation date
10/5/2006 11:30:01 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153317
Contractor Name
Limon, Town of
Contract Type
Loan
Water District
67
County
lincoln
Bill Number
SB 78-69
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SCHEDULE A <br /> <br />COLORADO WATER CONSERVATION BOARD <br />CONSTRUCTION FUND PROGRAM PROCEDURES <br /> <br />1. Board approval of engineering firm dnd engineering <br />. agreement between engineering firm dnd project sponsor. <br /> <br />2. Preparation of detailed plans and specifications for <br />author-lzed projects by consulting engineering firm. <br /> <br />3. Approval of detailed plans dnd specifications by Board <br />staff (plans and specifications for storage dams dnd <br />reservoirs must also be approved by State Engineer's <br />offIce). <br /> <br />4. Board stdff approval of bidding for the p~~Ject. BOdrd <br />staff present at.bId opening for construction. <br /> <br />! <br /> <br />5. Project sponsor may issue the notIce of award dnd the <br />notIce to proceed with construction to the, contractor <br />(both notices must. be approved by the 8oa~d staff before <br />they are Issued). <br /> <br />6. Conduct a pre-constr~ctlon conference." Approval of <br />ConstructIon schedule by Board staff. <br /> <br />7." Construction commences. The Board staff makes periodic <br />Inspections during construction. All change orders must <br />be approved bY the Board staff in advance and before any <br />constructIon on change Items can commence. Emergency <br />items cleared by telephone. <br /> <br />8. The consultIng engIneer certIfies that the project has <br />been completed according to approved drawings dnd <br />specifications and arranges for final inspection. <br /> <br />9. Final inspection and acceptdnce of as-buIlt project by <br />Board staff. <br /> <br />10. Submittal of as-built drawings to Board staff for <br />approval and flli~g. <br />