Laserfiche WebLink
<br />). Require alL Sub-contractors to indemnify the State and <br />the Contractor agai.nst all llabillty clnd loss, clnd d!jdinsl dLl <br />cldims and actions l)clSed UI)Oll or arising out of damage or <br />injury, Including death, to persons or property caused by or <br />sustained in connection with the performance of any sub- <br />contrdct or by conditioflS created thereby, or based upon allY <br />violation of any statute, ordinance, or reguLation, and tIle <br />defense of any such ciaims or dctions. <br /> <br />4. <br />insurance <br /> <br />Require aii Sub-conLractors to mainlain lIabilily <br />in at least the followIng amounts; <br /> <br />a. For any injury to one person in any single <br />occurrence, the sum of One Ilundred Fifty Thousand <br />Dollars ($150,000). <br /> <br />b. For dny injury to two or more persons in any <br />single occurrence, the sum of Four Hundred Thousand <br />Dollars ($400,000). <br /> <br />Said liabiiity insurance shall name the Contractor <br />dnd the State dS co-Insureds. No paYlnents shall be made under <br />thIs contract unless a copy of a certificate of said liability <br />Insurance has been filed with the Colorado Water Conservation <br />Board. <br /> <br />5. Conveyor cause titie to be conveyed by deed or <br />other proper conveyance to the Colorado Water Conservation <br />Board, Department of Natural ResourcesJ State of Colorado, the <br />following portions of the proposed project facilities within <br />thirty (30) days of their completion: <br /> <br />Filter improvements, as shown In figures 3 and 4 <br />(AppendIces A dnd B) and described In detail as <br />follows; <br /> <br />a. RebuildIng of backwash trough wall, consisting of <br />one wall plug, approximately 8"x18"x18" at each <br />present bdCkwdsh trough open, for d totdl of nine <br />wall plugs. <br /> <br />b. New filter overflow modificdtlons. <br /> <br />c. Hew backwdsh troughs, replacing the Lhree <br />existing backwash collection troughs in edch filter <br />with four new troughs. A totdl of twelve trouylls <br />wlll be built. <br /> <br />d. Two 400-gpm pumps. <br />e. Two 600-gpm pumps. <br /> <br />f. Four surface wash agitators, to be added to each <br />filter, for a total of twelve. <br /> <br />g. A 166-foot 20-inch steel pipe and fittings. <br /> <br />h. Ten 20-lnch butterfly valves. <br /> <br />l. A 5900-gpm 20-lnch Inline mixer. <br /> <br />j. A 5900-gpm 20-1nch flow lube. <br /> <br />k. A 750-pound!day un it Line feeder. <br />1. A 1,500-I,ound!day alum feeder un il.. <br />m. A 1-gpm fluoride feed pump. <br />n. A 5-foot a-lnch steeL pipe and f iLL i Il~ S. <br /> <br />PoIqe 2 () f 7 P,IlJ{:5 <br />