My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00022
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:25:13 AM
Creation date
10/5/2006 11:29:51 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153568
Contractor Name
Coon Creek Reservoir & Ditch Company
Contract Type
Loan
Water District
72
County
Mesa
Bill Number
SB 89-85
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />CHAPTER <br /> <br />I <br /> <br />II <br /> <br />III <br /> <br />IV <br /> <br />V <br /> <br />i <br /> <br />VI <br /> <br />VII <br /> <br />TABLE OF CONTENTS <br /> <br />TITLE ~ <br /> <br />PROJECT SUMMARY <br /> <br />GENERAL INFORMATION AND BACKGROUND <br /> <br />A. INTRODUCTION 1 <br />B. DESCRIPTION OF EXISTING RESERVOIRS 2 <br />C. REHABILITATION OF WORK REQUIRED 3 <br />C. DESCRIPTION OF DRAINAGE AREA 4 <br />E. CLIMATE 4 <br /> <br />ORGANIZATION AND FINANCIAL STATUS <br /> <br />A. HISTORY OF THE ORGANIZATION 6 <br />B. POWERS AND AUTHORITY OF THE <br />ORGANIZATION 7 <br />C. FINANCIAL STATUS 7 <br /> <br />DESCRIPTION OF PROJECT LANDS <br /> <br />A. GENERAL 9 <br />B. LAND OWNERSHIP AND USAGE 9 <br /> <br />WATER SUPPLY AND WATER REQUIREMENTS <br /> <br />A. WATER REQUIREMENTS 11 <br />B. WATER SUPPLY 12 <br />C. WATER QUALITY 15 <br /> <br />PLAN OF DEVELOPMENT <br /> <br />A. GENERAL 16 <br />B. HYDROLOGY ANALYSIS 16 <br />C. OUTLET WORKS AND RESERVOIR CONTROL: 18 <br />EVALUATION AND PROPOSED IMPROVEMENTS <br />D. SPILLWAY: EVALUAT~ON AND PROPOSED 20 <br />IMPROVEMENTS <br />E. DAM EMBANKMENT: EVALUATION AND 24 <br />PROPOSED IMPROVEMENTS <br /> <br />ESTIMATED PROJECT COST <br /> <br />A. CAPITAL IMPROVEMENT COSTS 27 <br />B. SCHEDULE OF CONSTRUCTION & 29 <br />EXPENDITURES <br /> <br />PROJECT EVALUATION AND FINANCIAL PROGRAM <br /> <br />A. FINANCIAL ANALYSIS 30 <br />B. VALUE OF WATER 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.