My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00022
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:25:13 AM
Creation date
10/5/2006 11:29:51 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153568
Contractor Name
Coon Creek Reservoir & Ditch Company
Contract Type
Loan
Water District
72
County
Mesa
Bill Number
SB 89-85
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />C. REHABILITATION WORK REQUIRED <br /> <br />Problems and deficiencies in Coon Creek Reservoirs #1 <br />and #2 were initially outlined in a letter of November 23, <br />1982 from the state Engineer's Office to the Coon Creek <br />Reservoir Company (See Appendix). The letter initially <br />restricted water level of Coon Creek #1 to a level 5 ft. <br />below the spillway crest elevation, and water level of Coon <br />Creek #~ to a level 3 ft. below the crest of the spillway. <br />Based on the state Engineer inspections and our observations, <br />the major rehabilitation work required on the dams was <br />determined to be as follows: <br /> <br />~ Creek Reservoir ~ <br /> <br />1. Reconstruction of the main embankment to prevent <br />slumping. <br /> <br />2. Control of seepage through the dam embankment. <br /> <br />3. Enlargement and improvement of the spiliway <br />structure. <br /> <br />4. Improvements to the outlet works (bar rack, erosion <br />control, and pipe extension). <br /> <br />5. Placement of riprap for control of erosion on the <br />upstream side of the dam embankment. <br /> <br />Coon Creek Reservoir ~ <br /> <br />1. Control of seepage through the embankment structure. <br /> <br />2. Maintenance work on the embankment and control gate. <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />3. Regrading work and erosion control mats in the <br />spillway. <br /> <br />4. Installation of a flow measurement structure. <br /> <br />In the fall of 1984, the Reservoir Company completed <br />several work items required by the State Engineer on Coon <br />Creek Reservoir #1. This included removal of brush and logs <br />from the spillway, and cutting of live trees and brush on the <br />embankment. No other repair work has been done to Coon Creek <br />#1 since that time. <br /> <br />In the fall of 1988, the state Dam inspector recommended <br />that the Reservoir Company repair the main seep in Coon Creek <br />Dam #2. This was done by excavating the embankment in the <br />area of the seep and by replacement wi th acceptable compacted <br />material. The spillway was also cleaned out and minor earth <br />work was completed on the spillway channel. Following this <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.