Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />3.5 COST ESTIMATES <br /> <br />The project costs presented in Table 3-1 were derived from the following <br />detailed cost estimates. Allowances for contingencies, engineering and <br />administrative costs are included in order to approximate total project costs <br />(1985 doll ars). <br /> <br />3-13 <br />