My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00020
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2010 12:54:54 PM
Creation date
10/5/2006 11:29:47 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153567
Contractor Name
Grand Junction, City of
Contract Type
Loan
Water District
72
County
Mesa
Bill Number
SB 89-85
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Ranked in inverse numerical order (five points for highest, one point for <br /> <br /> <br />lowest), the ranking is then weighted according to the relative importance of <br /> <br /> <br />the evaluation category. A summary of the ranking rationale for each category <br /> <br /> <br />is as follows: <br /> <br />Project Cost. A numerical ranking of initial construction and related project <br />costs brings Alternatives A and B-1 to the forefront from a purely economic <br />s tandpoi nt. To demons trate re 1 ati ve importance, project cos t rank i ngs are <br />given a multiplier of 10. <br /> <br />o & M Considerations. Alternative A is ranked the highest with regard to 0 & M <br />because of: <br /> <br />1. Its accessibility - The diversion structure, measuring flume, and <br />intake structure are located right along side Lands End Road below <br />the poi nt where pavement and wi nter mai ntenance ends. The <br />Alternative B diversion structure is not only above that point nearly <br />three miles, but is a considerable distance from the road. Air <br />release valves are also readily accessible for periodic inspection <br />and maintenance. <br /> <br />2. Soil erosion and high velocities are not a major factor as with <br />Alternative B options. <br /> <br />3-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.