Laserfiche WebLink
<br />~ <br />) <br /> <br />.,' <br /> <br />unless such time is extended by mutual agreement of the parties <br />hereto in writing. <br /> <br />3. As compensation for the services of the Contractor, the <br />state shall pay to the Contractor the sum of Forty-Two Thousand <br />Dollars ($42,000) in the manner following: <br /> <br />a. Sixty percent (60%), to wit, Twenty-Five Thousand Two <br />Hundred Dollars ($25,200) of the total amount due in two (2) <br />monthly installments of Twelve Thousand six Hundred Dollars <br />($12,600) each, commencing Thirty (30) days after the date <br />of this contract. <br /> <br />b. The remaining forty percent (40%), to wit, sixteen <br />Thousand Eight Hundred Dollars ($16,800) within forty (40) <br />days fOllowing receipt and acceptance of the written report <br />specified in paragraph 2. of this contract. <br /> <br />4. The total cost of services to be rendered for the <br />Contractor by the Consultant is Sixty Thousand Dollars ($60,000) <br />and the Contractor shall pay the sum of Eighteen Thousand <br />Dollars ($18,000) as agreed to by letter dated September 21, <br />1992, which is hereby attached and made a part of this contract <br />as Appendix B; and in no event shall this payment be the <br />liability of the State of Colorado. <br /> <br />5. In consideration of the State assuming a portion of the <br />cost of the preparation of the said project feasibility report, <br />the Contractor sharI pay to the state the sum of Fifty-Four <br />Thousand Three Hundred Ninety Dollars ($54,390), which is <br />principal plus interest at five percent (5%) per annum for ten <br />years, providen that construction of the subject water project <br />is initiated within ten (10) years of the date of this contract. <br />If, however, Contractor obtains a loan from the Colorado Water <br />Conservation Board for the construction of the project, the <br />Contractor shall pay Forty-Two Thousand Dollars ($4.'2,000) to the <br />State. The Contractor shall fulfill this obligation <br />irrespective of how or by whom or to what specifications or <br />plans the subject project is financed, paid or constructed for <br />so long as ,construction of the project is initiated within the <br />specified time. <br /> <br />6. In the event the Contractor must make payment pursuant <br />to the terms of paragraph 5. above, the Contractor shall pay to <br />the State the said sum of Fifty-Four Thousand Three Hundred <br />Ninety Dollars ($54,390), which is principal plus interest at <br />five percent (Sf) per annum, if the Contractor arranges to <br />finance the water construction project other than by a State <br />loan, and said sum of Fifty-Four Thousand Three Hundred Ninety <br />Dollars ($54,390) shall be payable in ten (10) equal yearly <br /> <br />Page f. of i Pages <br />