My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00017
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:22:21 AM
Creation date
10/5/2006 11:29:42 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153631
Contractor Name
Beaver Reservoir Company
Contract Type
Loan
Water District
59
County
Gunnison
Bill Number
FSA
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,<8 <br />,I1~1 <br /> <br />Woodward.clyde <br />Consultants <br /> <br />5. Combinations of the above. <br /> <br />Based on the results of the field investigation, a partial, temporary remedial design may <br />be developed for implementation prior to the 1993 irrigation season. .Ihe~temporary' / <br />. design is likely to consist of backfilling and capping of the existing sinkholes. ' <br /> <br />2.5 TASK 5 . PRELIMINARY DESIGN <br /> <br />WCC will develop a preliminary design for the preferred remedial alternative. This <br />design will be developed based on the available subsurface data and will be supported <br />by preliminary technical analysis of the flow regime through and beneath the <br />embankment. The design work will include the following items: <br /> <br />. Selection of location, configuration, and dimensions of remedial action <br />components <br />· Seepage analyses <br />· Material-selection and mix designs <br />· Evaluation of constructability <br /> <br />We anticIpate that the preliminary design will be presented on three drawings as <br />su=ari2ed below: <br /> <br />· Embankment Plan and Field Investigation Map <br />· Embankment and Geologic Sections <br />· Details <br /> <br />The design work will be documented in the form of technical memorandums and <br />calculation briefs which will be incorporated in the project files and accessed as <br />necessary for feasibility study report preparation. <br /> <br />2.6 TASK 6 - CONSTRUCTION COST ESTIMATE <br /> <br />WCC will derive a construction cost estimate for the design based on current regional <br />and other pertinent factors influencing the overall construction cost. This task will <br /> <br />92D227PFP227 06-15.Q2(1 0: 17pmllPROfS4 <br /> <br />-8- <br />
The URL can be used to link to this page
Your browser does not support the video tag.