Laserfiche WebLink
<br />a <br />I. <br />I <br />I <br />I <br />I <br />, <br />I <br />I <br />,. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I. <br />I <br /> <br />. <br /> <br />. <br /> <br />Woodward.clyde <br />Consultants <br /> <br />GARRETT O. JACKSON <br /> <br />page 2 <br /> <br />earthwork construction recommendations, remediation of liquefaction-susceptible <br />soils beneath existing and proposed structures, stability evaluation of daylighted <br />rock beds, remediation of collapsible soils, and evaluation of settlement of 30-foot <br />high fill. <br /> <br />· Project manager/engineer for alignment investigation and construction of the <br />Castaic Lateral N-l Turnout, a 5200-foot-Iong water supply line. Performed <br />geotechnical investigation and provided earthwork construction recommendations <br />and construction services. <br /> <br />· Project manager/engineer for investigation of several leaking underground fuel <br />tanks and broken fuel lines in Los Angeles, Ventura, and Santa Barbara counties, <br />California. Responsible for conducting site investigations, evaluating disposal <br />alternatives for contaminated soil and water, recovering free product, removing <br />underground tanks, conducting vapor extraction tests, and reporting to regulatory <br />agencies. <br /> <br />· Project engineer responsible for geotechnical investigations and foundation design <br />for rehabilitation of North Hollywood and Buena Vista pumping stations, <br />seismically deficient lifeline pumping stations in Los Angeles, California. Projects <br />included design of deep foundations (caissons and rock-socketed piers), rock <br />strength evaluations, and retaining wall design recommendations for retention of <br />high cut slopes in landslide ateas. <br /> <br />· Project engineer for. construction of Maclay Tanks, two 300-foot-diameter <br />prestressed concrete tanks embedded 17 feet below the surface in a seismically <br />active area. Performed initial feasibility study, conducted geotechnical <br />investigation, and provided earthwork construction, foundation, and lateral <br />dynamic earth pressure recommendations. <br /> <br />· Project engineer responsible for geotechnical investigation of soil and rock <br />conditions in collapsed tunnel heading for Stone Canyon Trunkline Tunnel, Los <br />Angeles. . Provided lateral earth pressure and bearing capacity recommendations <br />for tunnel supports and 25-foot-deep braced excavation. . <br /> <br />. '-. ,," <br />· Project engineer for Ascot Tank, a 10-million-gaIlon.prest,ressedcoricrete'lifeline <br />water supply tank constructed to replace a decomnnS$i()Ited:r~s~tWitin Los <br />Angeles. Pro~ect involved removal o~ 50-year-old wagp~7~glJ~d"l:ar!~kq~;r~~se <br />of dam mat~nals as fill in .the reservOIr ?asin, . and eval~~~~~~\~vet~ttirdip'~ng <br />rock formatIOns exposed m the reservOIr basm walls.'~" - <br /> <br />, <br /> <br />0l2709R,OOl 06-26-92 <br />