My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00015
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:22:21 AM
Creation date
10/5/2006 11:29:38 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153631
Contractor Name
Beaver Reservoir Company
Contract Type
Loan
Water District
59
County
Gunnison
Bill Number
FSA
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />i <br />'. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I. <br />I <br /> <br />. <br /> <br />. <br /> <br />Woodward.Clyde <br />Consultants <br /> <br />GARRETI O. JACKSON <br /> <br />project management <br />foundation engineering <br />design and construction <br />environmental remediation <br /> <br />EDUCATION <br /> <br />Brigham Young University, M.S., Civil Engineering, 1987 <br />Brigham Young University, B.S., Civil Engineering, 1987 <br /> <br />REGISTRATION <br />Registered Professional Engineer: California <br /> <br />PROFESSIONAL HISTORY <br /> <br />Woodward-Clyde Consultants, Senior Staff Engineer, 1991 to date <br />Harding Lawson Associates, Project Engineer, 1989-1991 <br />Los Angeles Department of Water and Power, Civil Engineering Assistant, 1987-1989 <br /> <br />REPRESENTATIVE EXPERIENCE <br /> <br />Mr. Jackson has over 4 years of experience as a civil engineer. He has directed field and <br />laboratory investigations, analyses, design, and report preparation for earth dams, <br />municipal facilities, individual buildings, and environmental remediation projects. <br /> <br />Mr. Jackson's experience includes development of design criteria; preparation of plans, <br />specifications, feasibility studies and construction cost estimates; construction <br />engineering; and project management. His experience ranges from initial site <br />investigation through project construction. Representative projects include: <br /> <br />· Project engineer for investigation and evaluation of Orangeburg Substation Dam <br />for the U.S. Fish and Wildlife Service. Project included evaluation of static and <br />dynamic slope stability, liquefaction potential, hydraulic capacity, and <br />rehabilitation alternatives for low earth dam. <br /> <br />· Resident engineer for construction of land treatment unit for Champion <br />International in Libby, Montana for bioremediation of creosote-contaminated <br />soils. Project consisted of layout and construction of clay-lined treatment <br />excavation. <br /> <br />· Field engineer responsible for design, assembly, testing, and installation of <br />instrumentation for evaluating vertical transport of radiqii.1!clides by. percolating <br />water at EG&G's Rocky Flats facility. . ,.{";,;. .[' <br /> <br />· Project manager/engineer for expansion of Valencia, Tapia, and Rancho Las <br />Virgenes wastewater treatment and solids-handling facilities in Los Angeles <br />County. Projects included geotechnical investigations, foundation design and <br /> <br />012709R.OOl 06-26-92 <br />
The URL can be used to link to this page
Your browser does not support the video tag.