My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00015
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:22:21 AM
Creation date
10/5/2006 11:29:38 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153631
Contractor Name
Beaver Reservoir Company
Contract Type
Loan
Water District
59
County
Gunnison
Bill Number
FSA
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />Ie <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I. <br />I <br /> <br />. <br /> <br />. <br /> <br />Woodward-Clyde <br />Consultants <br /> <br />numerous dam safety evaluations of existing impoundments for federal, state, and local <br />government agencies. <br /> <br />Mr. Johnson's experience includes the following projects which required expertise similar <br />to that necessary for the Beaver Reservoir: <br /> <br />· Supervised all field and design work for repairs on 75-foot high Gurley <br />Reservoir Dam. The earth embankment is owned by Farmers Wi/-ter <br />Development Company of Norwood, Colorado. The program evaluated <br />causative mechanisms for sinkholes in the embankment and foundation <br />and requirements for refurbishing and upgrading outlet works. The design <br />included a triple-line foundation grout curtain, relined outlet tunnel and <br />new intake structure and gate. Construction was completed during a four <br />month period following completion of the irrigation season. <br /> <br />· Supervision of field investigation, engineering design, preparation of <br />construction documents, and construction monitoring for remedial <br />construction at Buckeye Reservoir Dam in Montrose County, Colorado for <br />the Paradox \::alley Water Conservancy District. The remedial work <br />included a slurry wall to reduce embankment seepage, a raised <br />embankment crest to increase storage, a new emergency spillway to meet <br />State of Colorado flood routing and storage standards, and refurbishing <br />the existing outlet works including relining the outlet conduit and replacing <br />the intake control gates and intake structure. <br /> <br />· Conducted field investigations, design analyses, and construction inspection <br />for impoundment expansions for Anaconda Minerals Company in <br />Tonopah, Nevada; Ranchers Exploration and Development in Enterprise, <br />Utah; and Reserve Mining Company in Silver Bay, Minnesota. <br /> <br />· Safety evaluation of Fort Cobb Dam (1 DO-foot high) in Caddo County, <br />Oklahoma and Arbuckle Dam (150-foot high) in Murray County, <br />Oklahoma for the Bureau of Reclamation's SEED (Safety Evaluation of <br /> <br />92D227PIP227 06-25-92(IO,17pm)/PRO/54 <br /> <br />-12- <br />
The URL can be used to link to this page
Your browser does not support the video tag.