Laserfiche WebLink
<br />I <br />'. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />.. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />,. <br />I <br /> <br />. <br /> <br />. <br /> <br />Woodward-Clyde <br />Consultants <br /> <br />2.0 <br />SCOPE OF WORK <br /> <br />WCC proposes to perform the following tasks in accordance with the Contract <br />Conditions included in Attachment B. <br /> <br />2.1 TASK 1 - REVIEW OF EXISTING INFORMATION <br /> <br />This task will be performed simultaneously with Task 2 - Field Investigation to provide <br />rapid collection of the data required for evaluation of remedial alternatives. The <br />purpose of the review is to familiarize WCC with previous work performed at the site. <br />This will prevent unnecessary duplication during the investigation and data collection <br />effort and will thereby minimize the length and cost of the investigation. <br /> <br />The review will concentrate on available information concerning the configuration, <br />condition and component material properties of the embankment and dam foundation. <br />While significant gaps are believed to exist in the available database, especially <br />concerning critical embankment and foundation material properties, we understand that <br />valuable data from earlier investigations will be available. In addition, existing geologic <br />maps and air photos of the site will be obtained and evaluated. Areal joint patterns and <br />fault traces will be delineated and interpreted where possible and an evaluation of their <br />significance to sinkhole development will be made. <br /> <br />The proposed field investigation program will be refined based on the review of existing <br />information to maximize the effectiveness and minimize the cost of the subsurface <br />exploration. <br /> <br />2.2 TASK 2 - FIELD INVESTIGATION <br /> <br />The purpose of this task is to provide sufficient data concerning the configuration, <br />condition and component material properties of the embankment and foundation to <br />provide a firm technical foundation for the development of a suitable, cost effective <br /> <br />92D227P!P227 06-2~-92(IO,17pm)IPRO/~4 <br /> <br />-3- <br />