My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00012
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:22:20 AM
Creation date
10/5/2006 11:29:29 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153542
Contractor Name
Fruitland Irrigation Company
Contract Type
Loan
Water District
40
County
Delta
Bill Number
SB 88-30
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EXHIBIT F <br /> <br />~IVEO <br />FEe 23 '89 <br />~>'VA1"EIi <br />COMPA~FI~1"ION <br />81415 <br /> <br />FRUITLAND IRRIGATION <br />CRAWFORD~ COLORADO <br /> <br />IDIEIJ JMDII, ftESIIENJ <br />921-772! <br /> <br />IDl.l.IM tI.If8, 2DETMr <br />921-7l2l <br /> <br />February 21, 1989 <br /> <br />Colorado Water Conservation Board <br />1313 Sherman Street <br />Denver, Colorado 80203 <br /> <br />Attention: David Walker <br /> <br />Re: Onion Valley Dam - Gould Reservoir Feasibility, <br />Follow-Up on former request to increase funds for the <br />feasibility study. <br /> <br />Dear Mr. Walker: <br /> <br />Certainly, you are aware of the-status of our project, however <br />permit me to bring you up to date anyway~ At present, we are: <br /> <br />1. In the process of selecting a new engineering firm to com- <br />plete the project. This selection has been made necessary <br />by CWCB policy changes calling for engineers to-furnish E <br />and 0 insurance~ <br /> <br />2. UTE Engineering has agreed to cooperate with the newly <br />selected engineer (probably Western Engineers from Grand <br />Junction~ Colorado) to expedite transfer of the project and <br />to minimize duplication of engineering work_ <br /> <br />3_ <br /> <br />Fruitland Irrigation Company <br />for items of work required to <br />stage of completion_ <br /> <br />is indebted to UTE Engineering <br />bring the project to this <br /> <br />1 <br />EXHIBIT F <br />(Project Contract) <br />
The URL can be used to link to this page
Your browser does not support the video tag.