My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00012
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:22:20 AM
Creation date
10/5/2006 11:29:29 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153542
Contractor Name
Fruitland Irrigation Company
Contract Type
Loan
Water District
40
County
Delta
Bill Number
SB 88-30
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />P~rt <br />out I '.:>t <br /> <br />WIll be to detern\lne tIlE' reQL(lr"ements for rep~lr of <br />CQn0l.llt. rhe worl.. ...qll lncl'_(o<o>: <br /> <br />the <br /> <br />~ Determin~tlon of the extent of d~m~ge to the <br />e::isting :6-lnch pipeline. <br />b. Determine' the e;:tent of d~_m.:\ge to the inlet s-truc- <br />ture due to erosion around or ne?r the present <br />inlet elbo. <br />c. Determine the feasibility of constructing ~ new <br />structure from the r~servoir bank to the top of the <br />e:dsting outlet wor-ks tower. <br /> <br />Items of 'work to be included in P""rt-l-? will include elevations <br />of the inlet and outlet of the conduit, high water elevation of <br />the reserv01r, and calculatIons to determine maximum flows out of <br />the condUIt at different reservoir levels. We WIll photograph <br />the damaged portions of the outle~ conduit and me~sure deflec- <br />tions by comparIng the present conduit si=e and shape to the si=e <br />and s-hape of the condui t when new. We wi 11 2.cc....lr.?_tel y me,;\sure <br />the location of the dam.?ged po_rtion of the conduit with respect <br />to a bench mar'~ located at the outlet end of the pIpe. Eleva- <br />tions of the d~mdged portIons will be estlm~ted. <br /> <br />The fea=ibillty of our tentatIve recommendations to repelr the <br />cond~it by inserLlng d steel pioe sleeve wlll be investigated. <br />Calculations will be Derfo~med to fvrnish a flow curve tr.rough <br />the new plpe for comparison with the present pIpe. Altern2te <br />methods of repair will be discllsseU which will incluae bre2chlng <br />the dam and installing a new conduit. <br /> <br />Conclusions- and recommendations will be made regarding the method <br />of repair we feel would be in the best interests of the-Ow0er~ a <br />cost &stimate of the repair, and the estimdted time required for <br />constrLlct.i on. <br /> <br />Part-l-b will include photogrClphs C1nd elevCltions of the damaged <br />portion of the inlet structure. Recommendations will be made <br />for repair of the damage and for prevention of recurrence of <br />future damage. We will preoare an p~~jm~~~ n~ ~~~. _I ---- <br />
The URL can be used to link to this page
Your browser does not support the video tag.