My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00012
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:22:20 AM
Creation date
10/5/2006 11:29:29 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153542
Contractor Name
Fruitland Irrigation Company
Contract Type
Loan
Water District
40
County
Delta
Bill Number
SB 88-30
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EXHIBIT ^ <br /> <br />'-c,r----. <br />DI t:;'Jt::;__ <br />l;..lfl...,. ),\:~-::---~ <br />"...'", ......., <br />::"f.!I~/);:;! <br />(: ,c '. ---.Jlf) <br />"-, I 01" ..... <br />..//;::):; <br />COI01 '. <br />CONS[II::g2 ~VA ("II <br />t. BOARD <br /> <br />1686 <br /> <br />Oct ober 6. 1986 <br /> <br />SCOPE OF SERVICES - FRUITLAND MESA WATER CONSERVANCY DISTRICT <br />ENGINEERING FEASIBILITY STUDY, <br />ONION VALLEY DAM (GOULO RESERVOIR) OUTLET PIPE <br />PRIMARY TURNOUT STRUCTURE <br />SECONDARY TURNOUT STRUCTURE <br /> <br />Ute EngineerinG and Surveying Company will prepare an Engineering <br />Feasibility Study for the above items of work. The Study will <br />include the following items of warl: as outlined in the eWeB <br />Guidelines: <br /> <br />A. All report compilation and copying. <br />8. Prepare a Project Map, The- map w1ll show the location of <br />the dam, the relevant canal, and the location of the two <br />structures requiring repair. <br />c. District organi~ation data, including the Fruitland <br />Irrigation Company, will be presented in the Report only to <br />the e;.:tent thCl.t informCltion 15 available from the O.....ner. An <br />in-depth revie..... of the organization and its history is <br />beyond the scope of this reoort. Fina.ncico.l da,tc? .....i11 be <br />presented in the form it is furnished to the EnGineer. <br />D. An abbreviated discussior, of .....c?,ter .....: II be presented. The <br />discussion will be designed to m~l~e tne reader of the Report <br />familiar .....ith the mode of operation af the reservoir and <br />canals, the f10.....s into and demands on the reservoir, ~nd a <br />tabulation of surface streamflows if data is availab~e. It <br />is beyond the scope of this report to develop monthly farm <br />delivery requirements~ consumptive use, farm efficiency, <br />.....ater lasses, etc. The proposed project is to repair <br />existing structures and does not contemplate any gro.....th or <br />addition of ne..... lands or District members. <br />E. W~ter rights .....il1 be tabulated to the extent of inform~tion <br />available from the Owner. It is beyond the scope of this <br />report to research .....ater rights. The w~ter rights to be <br />used'for this project. will be discussed .....ith regard to their <br />
The URL can be used to link to this page
Your browser does not support the video tag.