My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00008
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:04 AM
Creation date
10/5/2006 11:29:23 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0037X
Contractor Name
Long Draw Reservoir Project USBR 1968
Contract Type
Loan
Water District
0
County
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> 3 <br /> TABLE I-B <br />I, FROST FREE PERIOD <br /> Fort CoIl ins Greelev <br /> Las t Sp ring Fi rst Fall Days Between Last Spring First Fall Days Between <br /> Year 280 Frost 280 Frost Dates 280 Fros t 280 Frost Dates <br /> 1957 Apri 1 28 Sept. 22 147 Apri I 28 Oct. 26 181 <br /> 1958 Apri 1 30 Oct, 154 Apri 1 30 Oct. 154 <br /> 1959 Apri 1 22 Oct. 3 164 Apri I 20 Oct. 3 166 <br /> 1960 May I Nov. 2 185 Apri 1 30 Oct. 31 184 <br /> 1961 April 26 Sept. 25 152 Apri 1 27 Oc t.. 2 158 <br /> 1962 May 1 Oct. 20 172 May 1 Oct. 25 177 <br /> 1963 Apri 1 23 Nov. 192 Apri 1 23 Nov. 192 <br /> 1964 Apri I 26 Oct. 19 176 Apri 1 9 Oct. 19 193 <br /> 1965 March 3D Sept. 17 171 March 30 Sept. 17 171 <br /> 1966 May 13 Oct. 4 144 May 12 Oct. 4 145 <br />~ Average 165.7 172. I <br />
The URL can be used to link to this page
Your browser does not support the video tag.