Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />THE SELECTED PROJECT <br /> <br />The company has chosen Alternative 3 which is to maintain the height of the dam to the current <br />crest elevation and maintain the current storage level. The total estimated cost of this alternative <br />is shown in Table 4 and 8 and as follows. The total cost shown below includes the cost the <br />Company has incurred to breach the dam and the cost of the investigations, breach design, <br />surveying, and feasibility study, <br /> <br />Estimated Construction Cost......................................,. <br />35% EngineeringfLegallContingency Costs................ <br />Cost Of BreachfSurveyingfGeotechfFeasibiIity........... <br />TOTAL ESTIMATED COST ...................................... <br /> <br />$ 977,980 <br />$ 342,293 <br />$ 68.775 <br />$1,389,048 <br /> <br />The fund requirement schedule for the Leroux Creek Water Users and CWCB is as follows. <br /> <br />TABLE 5 <br />FUND REQUIREMENT SCHEDULE <br /> <br />YEAR Leroux CreeJc Water Users CWCB <br />1998 $68,775 $5,000 <br />1999 $70,125 $1,250,100 <br /> <br />The funds required by the Leroux Creek Water Users in 1998 includes the construction costs of <br />the temporary breach excavated in October 1998 by Farnsworth Construction, the geotechnical <br />investigation conducted by Lambert & Associates, the surveying conducted by Consolidated <br />Consulting Services, and the breach design and feasibility study conducted by Smith Geotechnical. <br />A break down of these costs is as follows. <br /> <br />1. <br />2. <br />3. <br />4, <br />5. <br /> <br />Dam Breach <br />Geotechnical Investigation <br />Surveying <br />Breach Design <br />Feasibility Study <br /> <br />$45,000 <br />$12,700 <br />$ 5,325 <br />$ 2,850 <br />$ 5.750 <br />$68,775 <br /> <br />The total cost of the Feasibility Study is $10,750; however, $5,000 will be paid for by a grant <br />from the CWCB and thus is not shown above as funds required by the Company. <br /> <br />The funds required of the Leroux Creek Water Users will be 10% of the estimated total cost of <br />the project. <br /> <br />The funds requested from the CWCB will be 90% of the total estimated project cost, <br /> <br />Carl Smith Dam Feasibility <br /> <br />Page 28 <br />