Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE 8 <br />COST ESTIMATE <br /> <br />CARL SMITH DAM <br />Alternative No.4 - Increase Dam Height <br />Dam Crest @ Elevation 8267' <br />3 <br /> <br /> : 1 Uostream & Downstream Slones <br /> UNIT <br />ITEM DESCRIPTION OUANTITY UNITS PRICE AMOUNT <br />1. Mobilization, Insurance, Bonds 1.00 L.S. $212,614.50 $212,615 <br />2. Stripping 6.00 Acre $1,500.00 $9,000 <br />3. Dam <br /> a. Excavation (D.S. failure zone) 8000.00 C.Y. $3,00 $24,000 <br /> b. Seepage Cutoff Trench Excavation 52000.00 C,Y, $2.50 $130,000 <br /> c. Embankment Fill 522000,00 C.Y. $2.50 $1,305,000 <br /> d, Borrow Material 574200.00 C,Y. $1.75 $1,004,850 <br /> e. V.S, Riprap 8500.00 c.y, $18,00 $153,000 <br /> f. Toe Drain 3000,00 L.F. $20.00 $60,000 <br /> g. Drainage Blanket 6800.00 TONS $25.00 $170,000 <br />4. Outlet (410') <br /> a. Trench Excavation 300.00 C.Y. $4.00 $1,200 <br /> b, Fill 300,00 C,Y. $4,00 $1,200 <br /> c. Pipe - 18"Dia.-concrete bedded 410.00 L.F. $160.00 $65,600 <br /> d. Intake Structure 12.00 C.Y. $550.00 $6,600 <br /> e. Gate/ StemlOperator/StaffGage 1.00 L.S. $33,000.00 $33,000 <br /> f. Outlet Headwall 10.00 c.y. $450.00 $4,500 <br /> g. Riprap 50.00 TONS $20,00 $1,000 <br /> h. Bedding 25.00 TONS $30.00 $750 <br />5. Grout Existing 14" Outlet <br /> a. Grout 9.00 C.Y. $600.00 $5,400 <br />6, Spillway (50' crest @ 6: 1 slopes) <br /> a, Excavation 500,00 C.Y. $4,00 $2,000 <br /> b. Fill 1500.00 C,Y, $4.00 $6,000 <br /> c. Concrete Wall 35.00 C.Y. $350.00 $12,250 <br /> d. Riprap 500.00 TONS $20.00 $10,000 <br />7. Seeding (hydroseed) 16.00 Acres $2,000,00 $32,000 <br /> <br />TOTAL CONSTRUCTION COST <br />35% Engineering/Contingency <br />OPINION OF TOTAL COST <br /> <br />$3,249,965 <br />$1,137,488 <br />$4,387,452 <br />