My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00001
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:22:19 AM
Creation date
10/5/2006 11:28:58 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153168
Contractor Name
Delta, City of
Contract Type
Loan
Water District
40
County
Delta
Bill Number
SB 77-35
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />General <br /> <br />I <br /> <br />The existing water system of the City of Delta consists <br />of several elements and include: <br /> <br />I <br /> <br />1. <br /> <br />raw water reservoirs, <br /> <br />2. raw water transmission pipelines, <br /> <br />I <br /> <br />3. <br /> <br />raw water control reservoirs, <br /> <br />I <br /> <br />4. <br /> <br />chemical treatment works, <br /> <br />5. <br /> <br />filtration plant facilities, <br /> <br />I <br /> <br />6. <br /> <br />distribution system, and <br /> <br />7. treated water reservoirs. <br /> <br />I <br /> <br />Raw water reservoirs were described in the previous section. <br />Each of the remaining elements as they exist in the present system <br />will be described in detail in this section. The information is <br />intended to provide all interested persons with a thorough background <br />on the operation of the water system including capacities of the <br />system and costs of operation. <br /> <br />I <br /> <br />I <br /> <br />Transmission Pipelines <br /> <br />I <br /> <br />The raw water transmission pipelines for the City of Delta <br />begin at the headwaters of Doughspoon Creek, and Dirty George Creek. <br />The collection system consists of 6-inch through 12-inch pipelines <br />and has a total length of approximately 23 miles. Most of the system <br />is buried at a shallow depth or lies directly on the ground. Some <br />sections of the pipeline are even suspended from trees by cables. The <br />collection system terminates in the center of the Delta Control <br />Reservoir ahead of the chemical treatment works. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Three main branches compose the collection system. These <br />are the original Delta Pipeline, the Doughspoon Aqueduct, and the <br />Dirty George Aqueduct. The original Delta Pipeline was a 6-inch clay <br />tile pipeline beginning at the headwaters of West Doughspoon Creek. <br />This line was built around 1903 and extends southeasterly approxi- <br />mately 6.4 miles along Dry Gulch to its junction with the main arm of <br />the collection system about 1/2 mile north of the Delta Control <br />Reservoir. A branch pipeline approximately 1/4 mile long at the upper <br />end of the original Delta Pipeline connects the system to a spring. <br />The main pipeline begins at the outlet works of the Burnett Reservoir <br />which is fed by seepage flows from the Doughspoon Reservoir located <br />on the hill above. At one time, a tunnel approximately 554 feet long <br />was used to collect water from the hillside to supply the pipeline. <br />The tunnel, in essence, acted as a horizontal well. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />, I <br /> <br />III - 1 <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.