My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ISFAPP00611
CWCB
>
Instream Flow Appropriations
>
Backfile
>
1-1000
>
ISFAPP00611
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2016 12:04:34 AM
Creation date
10/5/2006 10:19:45 PM
Metadata
Fields
Template:
Instream Flow Appropriations
Case Number
94CW0057
Stream Name
Pinos Creek
Watershed
Rio Grande
Water Division
3
Water District
20
County
Rio Grande
Instream Flow App - Doc Type
Final Decree/Stipulations
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />No. 94CW057 <br />Colorado Water Cons. Board <br /> <br />10. In Case No. 93CW43 , Water Division No.3, the Conserva- <br />ncy District obtained a decree for a conditional exchange right, <br />approving and judicially confirming its right to conduct an <br />exchange of its transmountain water from the Weminuche Pass Ditch <br />from the confluence of the Rio Grande and pinos Creek upstream on <br />Pinos Creek to the intake for the Del Norte Pipeline or any other <br />points within the decreed exchange reach. This exchange right <br />was obtained and is intended to help the Conservancy District <br />carry out its decree augmentation program on Pinos Creek. The <br />decreed amount of the conditional exchange right is 4 c.f.s., <br />with the right to store up to 17 acre feet in any year. <br /> <br />11. In this case, the CWCB seeks judicial confirmation of <br />an absolute instream flow right in Pinos Creek in the amount of <br />10.0 c.f.s (April 1 - August 15); 6.0 c.f.s. (August 16 - Novem- <br />ber 30); 4.50 c.f.s. (December 1 - February 29); 6.0 c.f.s. <br />(March 1 - March 31). The stream segment affected by the claimed <br />instream flow right is the natural stream channel of Pin~s Creek <br />from the confluence of Bennett Creek in the SW/4 SE/4, Sec. 29, <br />T39N, R5E, N.M.P.M. as the upstream terminus and extending to t~" <br />Del Norte Pipeline in the SW/4 NW/4, Sec. 15, T39N, R5E, N.M.p.r.. <br />as the downstream terminus,~;being a distance of approximately 3.0 <br />miles, all as more specificall"1 "described in the Application in <br />this case. ~ <br /> <br />12. The CWCB agrees that it will not object to any out-of- <br />priority depletions caused by nonagricultural wells with septic <br />syetems constructed above the headgate of the Del Norte Pipeline, <br />loc~ted at a point on the west bank of Pinos Creek whence the <br />southwest corner of Section 10, Township 39 north, Range 5 East, <br />N.M.P.M. bears North 0036' West, a distance of 2,547 feet, so <br />long as: <br /> <br />a. all such depletiol.s are augmented pursuant to the <br />Conservancy District's augmentation program decreed in Case <br />No. 84CW16 , Water Division No.3; <br /> <br />b. the depletions are replaced to Pinos Creek at or below <br />the headgate for the Del Norte Pipeline; and <br /> <br />c. the total amount of said depletions do not exceed 17 <br />acre feet of water in any year. <br /> <br />THE WATER REFEREE RULES: <br /> <br />The application is granted and a decree (ABSOLUTE) in the <br />amount of 10.0 c.f.s (April 1 - August 15); 6.0 c.f.s. (August 16 <br /> <br />3 <br /> <br />~. ~.. , ,r'''c. <br /> <br />,"~'-' ,.. .~ .' , <br />
The URL can be used to link to this page
Your browser does not support the video tag.