My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ISFAPP00342
CWCB
>
Instream Flow Appropriations
>
Backfile
>
1-1000
>
ISFAPP00342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2016 12:04:04 AM
Creation date
10/5/2006 10:18:43 PM
Metadata
Fields
Template:
Instream Flow Appropriations
Case Number
98CW0154
Stream Name
Greenhorn Creek
Watershed
St Charles River
Water Division
2
Water District
15
County
Pueblo
Instream Flow App - Doc Type
Final Decree/Stipulations
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />/ <br /> <br />. '\ <br /> <br />(,' .'.- <br /> <br />~1" <br /> <br />" ~-" ' <br /> <br />INSTREAM FLOW WATER RIGHT <br /> <br />NAME OF NATURAL STREAM: <br /> <br />Greenhorn Creek <br /> <br />LEGAL DESCRIPTION OF <br />INSTREAMFLOW TERMINI: <br /> <br />'Upstream Terminus: NEy., NEy., Section <br />35, T24S, R68W, 6th P.M, PUeblo County, <br />Colorado, 3900' feet from the South ,section <br />line and 450 feet from the East section line. <br /> <br />Downstream Terminus: HighiineDitch in <br />the SWY., NEy., Section 36, T24S, R68W, <br />6th P.M., Pueblo County, ColoradO-; <br /> <br />SOURCE OF WATER: <br /> <br />Greenhorn Creek <br /> <br />:", f.~";,;~,., '.... :.': .', , <br />o' \Pill'oRiTY'DATE: May II, 1998, provided;ihowevertllat this right shall be junior to <br />, " " '.",all priorities awarded in e~esfiled prior to 1998, and otherwise <br />" ,";junior as provid~ in C.R.S. 37-92-~06. <br /> <br />:.'- <br /> <br />AMOVNTO}?WATER: Instream flow of4.75 cfsabsolute (May 1 to Jut. 14) <br />Instream flow of 1.50 c.f.s. abso.lute (Jut. 15 to Nov. 14) <br />Instream flow of 0.85 c.f.s. absolute (Nov. 15 to Mar. 14) <br />Instream flow of 1.50 c.f.s. absolute (Mar. 15 to Apr. 30) <br /> <br />USE OF WATER: Instream flow to preserve the natural environment to a <br />reasonable degree <br /> <br />LAND IRRIGATED: None <br /> <br />IT IS FURTHER ORDERED that Applicant shall install and maintain such <br />water measurement devices, recording devices, content gauges and inlet and outlet <br />measurement and recording devices, as the case may be, as are deemed essential by the <br />Office of the State Engineer, and the same shall be installed and operated in accordance <br />with instructions from said Office. <br /> <br />IT IS FURTHER ORDERED that copies of this ruling shall be mailed as <br />provided by statute. <br /> <br />Ruling of Referee, Case No. 98CW1S4 <br /> <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.