Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />Green Mountain Reservoir <br /> <br />$ 6/af <br />$10/af <br />$55/af <br /> <br />Irrigation <br />Municipal <br />Industrial (plus a Power Interference <br />charge of $2.35/af if the water is needed <br />above Green Mountain). Additionally for <br />industrial users, arrangements on large <br />amounts of water can be made where by a <br />certain amount of money is paid for the <br />privilege to access the water, and an <br />additional delivery charge is made only <br />if the water is actually used. The fees <br />for this type of arrangement are <br />calculated on a case by case basis. <br /> <br />These prices were effective on April 25, 1991 and could <br />be subject to change. <br /> <br />SZU/bj <br /> <br />