My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10306
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD10306
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:12:48 AM
Creation date
10/5/2006 5:05:15 AM
Metadata
Fields
Template:
Floodplain Documents
County
Summit
Community
Frisco
Stream Name
Miners Creek/Jug Creek/No Name Creek
Basin
Colorado Mainstem
Title
Floodplain Study for Miners Creek and Jug Creek and No Name Creek
Date
8/1/1986
Prepared For
Frisco
Prepared By
US Army Corps of Engineers
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Draft 4 <br /> <br />~ <br /> <br />Section 9. ~erabilit;y. If any section, clause, prOV~SlOn, or <br />portion or portions of this ordinance should be found to be unconstitutional <br />or otheIWise invalid by a court of canpetent jurisdiction, the remainder of <br />this ordinance shall not be affected thereby and is hereby declared to be <br />necessary for the Id>lic health, safety, and welfare. <br /> <br />Section Ill. <br /> <br />Amendments. The requiranents, restrictions, and <br />boundaries set forth in these regulations may fran <br />time to tie be amended, supplemented, changed, or <br />repealed in accordance with the procedures set forth <br />be1CM : <br /> <br />I\mendments to the requirements or restrictions of <br />these regulations or to the boundaries on the <br />Official Maps and any adopted reports or supporting <br />materials shall be officially made by the TOwn Board <br />of Trustees only after such changes are reviewed by <br />the Frisco Planning and zoning Canmission; legal <br />notification to the Id>lic; official approval and <br />designation of the base flood data by the Colorado <br />Water Conservation Board; review by the Federal <br />Insurance Mninistration; Id>lication in full of the <br />ordinance adopting such maps and supporting <br />materials,; filing of not less than three copies of <br />such adopting ordinance with the Town Clerk at least <br />15 days before the Id>lic hearing; and, a public <br />hearing. <br /> <br />After adoption of such maps and supporting materials <br />at least one cop.{ of the adopting ordinance shall be <br />kept on file with the lIdministrator. <br /> <br />Section 11. <br /> <br />Effective Date. This Ordinance shall take effect <br />iJllllediately upon the expiration of five days fran <br />and after the final date of Id>lication as provided <br />by law. <br /> <br />RFAD, PASSED J\ND APHlOllED '!HIS _ DI\Y OF . 1986, BY A <br />MAJORITY OF '!HE Tam BOARD OF TRUSl'EES, OF '!HE Tam OF FRIS<X> <br /> <br />Page 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.