My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10292
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD10292
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:12:44 AM
Creation date
10/5/2006 5:04:34 AM
Metadata
Fields
Template:
Floodplain Documents
County
Morgan
Community
Weldona
Stream Name
South Platte River
Basin
South Platte
Title
Project Manual for Construction of Weldona Flood Control Improvements
Date
7/1/2001
Prepared For
Morgan County
Prepared By
WRC Engineering, Inc.
Floodplain - Doc Type
Project
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EXHIBIT VIII-W <br /> <br />PRECONSTRUCTION CHECKLIST FOR CONTRACTORS: <br />MEETING LABOR STANDARDS CONTRACT REQUIREMENTS <br /> <br />INTRODUCTION. The following checklist has been prepared to assist contractors and subcontractors in <br />meeting contractual labor standards responsibilities. All major administrative and procedural activities have <br />been covered in the sequence they will occur as the construction project proceeds. Careful attention to and <br />use of the checklist should result in a minimum number of problems with respect to labor standards. <br /> <br />EXPLANATORY NOTES. The word "employer" as used below refers to the project contractor, each <br />subcontractor, or each lower-tier subcontractor. Payrolls and other documentary evidence of compliance <br />MARKED WITH ASTERISK ARE REQUIRED TO BE SENT TO THE RECIPIENT FOR REVIEW (ALL TO <br />BE SUBMITTED THROUGH THE PROJECT CONTRACTOR). The delivery procedure is as follows: <br /> <br />. Each LOWER-TIER SUBCONTRACTOR, after careful review, submits required documents to <br />the respective subcontractor. <br /> <br />. Each SUBCONTRACTOR, after checking his own and those of each lower-tier subcontractor he <br />may have, submits required documents to the contractor. <br /> <br />. The CONTRACTOR, after reviewing all payrolls and other documentation, includin!l his own, and <br />correcting violations where necessary, submits all to the recipient <br /> <br />ALL EMPLOYERS SHOULD CHECK EACH OF THE FOLLOWING STATEMENTS AS BEING TRUE. IF <br />ANY STATEMENT IS NOT TRUE, THE CONTRACTOR OR HIS REPRESENTATIVE SHOULD CONTACT <br />THE RECIPIENT FOR SPECIAL GUIDANCE. <br /> <br />BEFORE CONSTRUCTION BEGINS EACH EMPLOYER HAS: <br /> <br />Not been debarred or otherwise made ineligible to participate in any Federal or <br />Federally-assisted project. <br /> <br />Received appropriate contract provisions covering labor standards requirements. <br /> <br />Reviewed and understands all labor standards contract provisions. <br /> <br />Received the wage decision as part of the contract. <br /> <br />Requested through the recipient and received the minimum wage for each classification to <br />be worked on the project which was not included on the wage decision by the ADDITIONAL <br />CLASSIFICATION process and before allowing any such trade(s) to work on the project. <br /> <br />Requested and received certification of his apprentice program from the State's Bureau of <br />Apprenticeship and Training (recognized by USBAT) and submitted copy thereof to the <br />recipient prior to employment on the project. Likewise, "trainee" program certification from <br />U.S.B.A.T. if applicable, must be submitted <br /> <br />VlIl-W-1 <br /> <br />(Revised 5199) <br />
The URL can be used to link to this page
Your browser does not support the video tag.