Laserfiche WebLink
<br />8.12 <br />8.13 <br />8.14 <br />8.15 <br />8.16 <br />8.17 <br /> <br />8-18 <br />8.19 <br />8.20 <br /> <br />9.1 <br />9.2 <br /> <br />9.3 <br />9.4 <br />9.5 <br />9.6 <br />9.7 <br /> <br />10.1 <br />10.2 <br /> <br />10.3 <br /> <br />11.1 <br />11.2 <br />11.3 <br /> <br />11.4 <br />11.5 <br />11.6 <br /> <br />11.7 <br />11.8 <br />12.1 <br />12.2 <br />12.3 <br />12.4 <br />12.5 <br />12.6 <br />12.7 <br />12.8 <br /> <br />12.9 <br /> <br />12.10 <br /> <br />12.11 <br /> <br />. . <br />" <br /> <br />Irrigation Efficiencies <br />Summary of Irrigation Demand Computation <br />Daily Water Requirements and Consumijtive Use Rates <br />Livestock Population Projections <br />Livestock Water Demands <br />Instream Flow Regimes for Fish, Wildlife, <br />Recreation and Related Environmental Resources <br />Study Area Near-Term System Demand in Megawatts <br />Statewide Near-Term Peak Demand in Megawatts <br />Amount of Pumped Storage Investment Cost <br />That May be Supported by System Operation <br />In 1988 $ <br />Future M&I Water Demands - No Development Scenario <br />Flow Through AB Lateral Hydropower Facility <br />Scenario 1 <br />Gunnison Tunnel Diversions - Scenario 1 <br />Shortages to Agricultural Demands - Scenario 1 <br />Upper Gunnison Instream Flow Deficiencies - Scenario 1 <br />Black Canyon Average Monthly Flow (CFS) - Scenario 1 <br />Blue Mesa Releases for Black Canyon Instream Flow - <br />Scenario 1 <br />Water Conservation and Management Components <br />Screening Criteria for Water Supply/Demand Management <br />Non-Structural Components <br />Summary of Screening Results - Water Management and <br />Conservation Measures <br />Targets for Angler Use of Streams After Improvement <br />Waterfowl and Wetland Improvement Opportunities <br />Approximate Cost and Feasibiltty 'of Acquiring <br />Recreation Access <br />Major Fishery and Recreation Improvement Opportunities <br />Screening of Recreation Components <br />Recreation Components Recommended for Inclusion in <br />Alternative Plans <br />Categorization of Recommended Recreation Components <br />Estimated Cost of Recreation Components <br />Identified Irrigation Shortages <br />Alternative Storage Sites Considered <br />Alternative Storage Sites Retained for Further Study <br />Los Pinos Project -Project Description and Cost Estimate <br />Pauline Project - Project Description and Cost Estimate <br />Castleton Project - Project Description and Cost Estimate <br />Elko Project - Project Description and Cost Estimate <br />Sargents No. 1 Project - <br />Project Description and Cost Estimate <br />Sargents No. 2 Project - <br />Project Description and Cost Estimate <br />Sargents No. 3 Project - <br />Project Description and Cost Estimate <br />Sargents No. 4 Project - <br />Project Description and Cost Estimate <br /> <br />10 <br /> <br />I 10003126 <br /> <br />8-28 <br />8-30 <br />8-32 <br />8-33 <br />8-34 <br />8-41 <br />8-48 <br />8-49 <br /> <br />8-54 <br />9-2 <br /> <br />9-5 <br />9-7 <br />9-8 <br />9-10 <br />9-13 <br /> <br />9-14 <br />10-2 <br /> <br />10-10. <br /> <br />10-11 <br />11-11 <br />11-13 <br /> <br />11-22 <br />11-24 <br />11-35 <br /> <br />11-40 <br />11-41 <br />11-42 <br />12-4 <br />12-9 <br />12-11 <br />12-18 <br />12-21 <br />12-24 <br />12-27 <br /> <br />12-29 <br /> <br />12-31 <br /> <br />12-33 <br /> <br />12-35 <br />