Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1.1 <br />1.2 <br />1.3 <br />1.4 <br />4.1 <br />4.2 <br />4.3 <br /> <br />4.4 <br /> <br />4.5 <br /> <br />4.6 <br /> <br />4.7 . <br />4.8 <br /> <br />4.9 <br />4.10 <br /> <br />5.1 <br /> <br />5.2 <br />6.1 <br />7.1 <br /> <br />7.2 <br /> <br />7.3 <br /> <br />7.4 <br />7.5 <br /> <br />7.6 <br />7.7 <br />7.8 <br />8.1 <br /> <br />8.2 <br /> <br />8.3 <br />8.4 <br />8.5 <br />8.6 <br />8.7 <br />8.8 <br />8.9 <br />8.10 <br />8.11 <br /> <br />LIST OF TABLES <br /> <br />Task Breakdown 1-11 <br />Advisory Committee Representatives 1-12 <br />Advisory Committee and Publ ic Meetings 1-\13 <br />Data Repositories 1-~4 <br />Curecanti National Recreation Area - Visitor Use 4-~ <br />Black Canyon of the Gunnison National Monument 4-3 <br />Water-Based Campground Data for the USFS - <br />Taylor River District 4-33 <br />Water-Based Campground Data for the USFS - <br />Cebolla District 4-34 <br />Water Based Campground Data for the USFS - <br />Ouray District 4-35 <br />USFS Recreation Use - All Developed and Dispersed <br />Activities (RVD's) 4-35 <br />USFS Recreation Use - Water-Based Activities (RVD's) 4-36 <br />Summary of Annual Recreation Use in the <br />Upper Gunnison and Uncompahgre Basins for 1986 4-37 <br />Public and Private land Ownership 4-38 <br />Public Access Status on Streams in the Upper Gunnison <br />and Uncompahgre Basins 4-39 <br />Representative Streamflow Points - <br />Flow Values in Acre-Feet 5-3 <br />Core Stations Used for Inflow File Development 5-6 <br />Colorado Water Conservation Board Instream Flow Rights 6-10 <br />Absolute Water Rights <br />Individually Represented in the Basin Model 7-9 <br />Priority Class Intervals Used for <br />Aggregation of Smaller Water Rights 7-13 <br />Conditional Decrees Operated in Basin Model <br />All Scenarios 7-17 <br />CWCB Instream Flow Decrees Represented in Basin Model 7-22 <br />Taylor River Privately Held Instream Flow Decrees <br />Potentially Affecting Previously Identified Projects 7-23 <br />Water Rights Represented in Basin Model 7-27 <br />Small M&I Systems Represented in the Basin Model 7-30 <br />Results of Final Model Calibration Run 7-34 <br />Population Forecasts by Scenario for Region 10: <br />1985-2035 (Thousands of Persons) 8-4 <br />Study Area Population Disaggregation - <br />Water Provider Format 8-6 <br />Historical Water Demands 8-9 <br />Per Capita Use Rates (gallons per capita per day, gpcd) 8-12 <br />M&I Water Demand Forecasts 8-13 <br />Mining Water Demand 8-16 <br />Summary of Irrigated lands 8-20 <br />Irrigated Agricultural lands in Gunnison County 8-21 <br />Cropping Patterns 8-24 <br />Climatic Conditions for Individual Sub-Basins 8-25 <br />Growing Season Parameters 8-26 <br /> <br />9 <br /> <br />.~ . <br /> <br />Ii IDO[]30125 <br />