My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10288
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD10288
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:12:42 AM
Creation date
10/5/2006 5:04:05 AM
Metadata
Fields
Template:
Floodplain Documents
County
Gunnison
Community
Upper Gunnison
Basin
Gunnison
Title
Upper Gunnison-Uncompahgre Basin Phase 1 Feasibility Study Final Report
Date
1/1/1989
Prepared For
Colorado Water Resources and Power Development Authority
Prepared By
HDR Engineering, Inc.
Floodplain - Doc Type
Floodplain Report/Masterplan
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
496
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />12.14 Sargents No.1 Project 12-28 <br />12.14.1 General 12-28 <br />12.14.2 Geotechnical, 12-28 <br />12.14.3 Project Description and Cost 12-28 <br />12.15 Sargents No.2 Project 12-30 <br />12.15.1 General 12-30 <br />12.15.2 Geotechnical 12-30 <br />12.15.3 Project Description and Cost 12-30 <br />12.16 Sargents No.3 Project 12-32 <br />12.16.1 General 12-32 <br />12.16.2 Geotechnical 12-32 <br />12.16.3 Project Description and Cost 12-32 <br />12.17 Sargents No.4 Project 12-34 <br />12.17.1 General 12-34 <br />12.17.2 Geotechnical 12-34 <br />12.17.3 Project Description and Cost 12-34 <br />12.18 Water Imports from Other Gunnison River Sub-Basins 12-36 <br />12.19 Screening of Alternatives 12-37 <br />12.19.1 Screening Criteria 12-37 <br />12.19.2 Cochetopa Creek Basin 12-37 <br />12.19.3 Ohio Creek Basin 12-38 <br />12.19.4 Tomichi Creek Basin 12-38 <br /> <br />13.0 FORMULATION AND EVALUATION OF ALTERNATIVE PLANS 13-1 <br />13.1 Introduction 13-1 <br />13.2 Plan Formulation 13-1 <br />13.2.1 Methodology 13-1 <br />13.2.2 Description of Plan Formulation 13-3 <br />13.2.3 Alternative Plan No. I. 13-3 <br />13.2.4 Alternative Plan No.2" 13-3 <br />13.2.5 Alternative Plan No.3 13-3 <br />13.2.6 Alternative Plan No.4 13-3 <br />13.2.7 Alternatives siand 6 13-4 <br />13.3 Hydrologic/Water Rights Evaluation of Alternative Plans 13-9 <br />13.3.1 Description of Scenarios for Alternative No.2 13-10 <br />13.3.2 Water Rights and Operating Rules 13-10 <br />13.3.3 Performance of In-basin Reservoirs, Scenario 2B~ 13-12 <br />13.4 Evaluation and Ranking of Alternative Plans 13-17 <br />13.4.1 Screening Criteria 13-17 <br />13.4.2 Cost Estimates 13-20 <br />13.4.3 Plan Evaluation and Ranking 13-20 <br />13.4.4 Preferred Alternative - AlternativeNo. 5' 13-28 <br /> <br />14.0 FINANCING OF PREFERRED ALTERNATIVE 14-1 <br />14.1 Introduction 14-1 <br />14.2 Potential Sources of Revenue 14-1 <br />14.3 Potential Sources of Financing 14-2 <br />14.4 Potential for Staged Construction 14-5 <br />14.5 Financial Analysis of Preferred Plan 14-5 <br />14.5.1 Sources of Funding and Resulting Annual Costs 14-6 <br />14.5.2 Sources and Amount of Direct Project Income 14-7 <br /> <br />6 <br /> <br />. . <br />~ 0' <br />.. <br /> <br />...._............1. <br /> <br />!l 110003122 <br />
The URL can be used to link to this page
Your browser does not support the video tag.