My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10288
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD10288
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:12:42 AM
Creation date
10/5/2006 5:04:05 AM
Metadata
Fields
Template:
Floodplain Documents
County
Gunnison
Community
Upper Gunnison
Basin
Gunnison
Title
Upper Gunnison-Uncompahgre Basin Phase 1 Feasibility Study Final Report
Date
1/1/1989
Prepared For
Colorado Water Resources and Power Development Authority
Prepared By
HDR Engineering, Inc.
Floodplain - Doc Type
Floodplain Report/Masterplan
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
496
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />,I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />11.4.3 East River and Slate River 11-16 <br />11.4.4 Taylor River Below Taylor Park Reservoir 11-16 <br />11.4.5 Taylor Park Reservoir and Tributaries 11-17 <br />11.4.6 Tomichi Creek and Tributaries 11-17 <br />11.4.7 Cebolla Creek 11-19 <br />11.4.8 Lake Fork of the Gunnison River 11-19 <br />11.4.9 Blue Mesa Reservoir and Small Tributaries 11-20 <br />11.4.10 Uncompahgre River 11-20 <br />11.5 Opportunities for Improving Public Access 11-21 <br />11.6 Summary of Fishery and Recreation Opportunities 11-23 <br />11.7 Screening of Recreation Opportunities and Components 11-31 <br />11.7.1 Screening Criteria 11-31 <br />11.7.2 Results of Screening 11-32 <br />11.8 Preliminary Cost Estimates 11-34 <br /> <br />12.0 STRUCTURAL COMPONENTS TO MEET IN-BASIN DEMANDS 12-1 <br />12.1 Introduction 12-1 <br />12.2 Methodology 12-1 <br />12.3 Demand Areas 12-3 <br />12.3.1 Agricultural Demands 12-3 <br />12.3.1.1 Identification of Demands 12-3 <br />12.3.1.2 Evaluation of Demand . 12-5 <br />12.3.2 Municipal and Industrial Demands 12-6 <br />12.3.3 Recreation Demands 12-6 <br />12.3.4 Water Quality 12-6 <br />12.3.5 Flood Control 12-7 <br />12.4 Identification of Alternative Reservoir Sites 12-7 <br />12.5 Preliminary Screening of Alternative Reservoir Sites 12-8 <br />12.6 Preliminary Reservoir Operation Studies 12-12 <br />12.7 Conventional Hydroelectric Development 12-12 <br />12.8 Cost Estimating Methods 12-13 <br />12.9 General Description of Screened Projects 12-14 <br />12.10 Los Pinos Project 12-15 <br />12.10.1 General 12-15 <br />12.10.2 Geotechnical 12-15 <br />12.10.3 Project Description and Cost 12-16 <br />12.11 Pauline Project 12-19 <br />12.11.1 General 12-19 <br />12.11.2 Geotechnical 12-19 <br />12.11.3 Project Description and Cost 12-20 <br />12.12 Castleton Project 12-22 <br />12.12.1 General 12-22 <br />12.12.2 Geotechnical 12-22 <br />12.12.3 Project Description and Cost 12-23 <br />12.13 Elko Project 12-25 <br />12.13.1 General 12-25 <br />12.13.2 Geotechnical 12-25 <br />12.13.3 Project Description and Cost 12-26 <br /> <br />5 <br /> <br />, ~ y <br />). '- <br /> <br />Ii 10003121 <br />
The URL can be used to link to this page
Your browser does not support the video tag.