My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10265
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD10265
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:12:36 AM
Creation date
10/5/2006 5:03:05 AM
Metadata
Fields
Template:
Floodplain Documents
County
Weld
Basin
South Platte
Title
Joint Southern Weld County Water System
Date
2/23/1989
Prepared For
Weld County
Prepared By
Consultants
Floodplain - Doc Type
Community File
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.~ <br /> <br />-1 <br /> <br />--.. <br /> <br />RECEIVED <br /> <br />FEB23'~ <br /> <br />PR:JJECT TITLE, NORTHEF:N COLORADO WATER QUALITY AUTHORITY - FEAebU.l~w!i~WA ..s> <br />STUDY CONSEAVATlO -.::. <br />BOARO <br />APPLICANT: City of Fort LUpton (Town of Plattevllle. Gllcrest. LaSalle. <br />Hudson, and City of Evans) <br /> <br />ADDRESS: PU BOH 148 <br /> <br />(130 S. McKinley) Fort Lupton, CD 80621 <br /> <br />CONTACT PERSON/TITLE: <br /> <br />Jack A. Hurst, City Administrator. Fort Lurton <br />Denver Line 893-5404 Local 857-6694. <br /> <br />PROJECT SUMMARYL The purpose of this project is to determine the <br />political. economical. and technical feasibility of combining resources; <br />and, reso~rce potenti~l in the delivery of acceptable drinking water at <br />reasonable cost to the Cities of Fort Lupton & Evans, and the Towns of <br />Gilcrest, Platteville, LaSalle, and Hudson. This feasibility study will <br />determine if such an effort would be technically possible, and should <br />provide resource alternatives, if they exist. If this program is <br />technically feasible it is anticipated that a water authority, Dr similar <br />enLity would be formed by two or more of the participating communities to <br />provide fiscal, legal and administrative support to the program. Most of <br />these communities have already conducted local studies to determine their <br />needs and the costs associated with the delivery of quality drinking <br />waler. It remains to be seen if a cooperative effort would yield water <br />which meets State Health and EPA demands at a cost effective level. <br /> <br />PROJECT BUDGET: <br />accounting. The <br />itself. <br /> <br />This project does not lend itself to line item <br />estimated cost will be consumed by the feasibility study <br /> <br />PROJECT FUNDING: <br /> <br />Impact Assistance ReqLll~st: $53,710 <br />Local Government Cash Share: $21,290 <br />Industry ~ash Contribution: -0- <br />Other Cash Contributions: -0- <br />TOTAL CASH COSTS: $75,000 <br /> <br />DESCRIBE IN-KIND CONTRIBUTIONS IN SUPPORT OF THE PROJECT: Each 01 the <br />communities represented will provide on-going le.~lal, administrative and <br />support as ne8ded. <br />FINANCIAL DATA: CITY OF FORT LUPTON (SEE ATTAtHED ADDENDUM) <br />Assessed Valuation $_JU~~I~~________Mill LevYJ]~~~_ <br />Overlapping Mill LevY:_ZJ~22~___Local Sales Tax __1___%' ~ <br />Tap Fees: Water $_~~_________Sewer$_L~]_________ <br />Avg. Monthly User Charges: <br />Water $_ll~_______per_h~~e_~~~~~ly~J~Qn~J2Q~~e <br />Sewer $_lQ~___________ - <br />Current Annual Budget: $_~11~L~j__________________ <br />Long term Debt by Type and Amount: <br />S.I.Ds $31~~QQL~~~~~31~QL~O~j_~~~!!h~~~~~~Jl~~0~~_______________________ <br /> <br />POPULATION: 1980 _'!~9iL______..________Cur rent: _~_?8~___________ (most recent lot ter y <br />distribution estimate) <br />5 yr F'roj ect ion _6J.f2.___________SoLlrce: ~!~t:..e.E_!'-l_~n_______.____ <br />
The URL can be used to link to this page
Your browser does not support the video tag.