Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLEll-6(cont.) <br /> <br /> Unit Total <br />Basin No. Item Quantity Unit Cost Item Cost <br />Basin 8 Clear and Grub 1.0 AC $750 $750 <br /> Excavation 8,980 CY $3.75 $33,675 <br /> Embankment Fill 2,120 CY $3.75 $7,950 <br /> Bedding Material for Riprap 82 CY $35 $2,870 <br /> Riprap 184 CY $35 $6,440 <br /> 30-in CMP (Transfer Basin 7 flows) 60 LF $34.50 $2,070 <br /> 12-in CMP (Basin 8 outlet) 80 LF $12.00 $960 <br /> Revegetation 1.5 AC $2,300 $3,450 <br /> Total Cost = $58,165 <br />Basin 9 Clear and Grub 0.4 AC $750 $300 <br /> Excavation 3,950 CY $3.75 $14,813 <br /> Embankment Fill 2,120 CY $3.75 $7,950 <br /> Bedding Material for Riprap 84 CY $35 $2,940 <br /> Riprap 189 CY $35 $6,615 <br /> 12-in CMP 80 LF $12.00 $960 <br /> Revegetation 0.6 AC $2,300 $1,380 <br /> Total Cost = $34,958 <br /> Mobilization Cost = $5,000 <br /> Total Construction Cost (6 Basins) = $388,310 <br /> 25% Contineencv = $97 .078 <br /> Construction Subtotal = $485,388 <br /> 20% Engineering and Administration $97,078 <br /> Land Acouisition Cost = $54.810 <br /> Total Cost (6 Basins) = $637,000 <br /> <br />Notes: <br />1. It has been assumed that excess excavated material will be disposed of by filling in depressions adjacent to work areas. <br />This will be done so as not to impact existing drainage patterns <br />2. Total Cost (6 Basins) has been rounded to the nearest $1,000. <br /> <br />CostEst <br />1121198 <br />