Laserfiche WebLink
<br /> ---------- --------------- ---- <br />I <br />I TABLED-6 <br />I FULL DETENTION ALTERNATIVE COST ESTIMATES <br /> Unit Total <br />I Basin No. Item Quantity Unit Cost Item Cost <br />Basin I Clear and Grub 0.5 AC $750 $375 <br /> Excavation 10,740 CY $3.75 $40,275 <br />I Embankment Fill 2,120 CY $3.75 $7,950 <br /> Bedding Material for Riprap 60 CY $35 $2,100 <br /> Riprap 66 CY $35 $2,310 <br />I 18-inCMP 20 LF $18.00 $360 <br /> Revegetation 2.4 AC $2,300 $5,520 <br /> Total Cost = $58,890 <br />I Basin 2 Clear and Grub 1.0 AC $750 $750 <br /> Excavation 7,940 CY $3.75 $29,775 <br /> Embankment Fill 2,120 CY $3.75 $7,950 <br />I Bedding Material for Riprap 83 CY $35 $2,905 <br /> Riprap 186 CY $35 $6,510 <br /> 12-in CMP 80 LF $12.00 $960 <br />I Revegetation 2.0 AC $2,300 $4,600 <br /> Total Cost = $53,450 <br />I Basin 3 Clear and Grub 1.2 AC $750 $900 <br /> Excavation 10,880 CY $3.75 $40,800 <br /> Embankment Fill 2,120 CY $3.75 $7,950 <br />I Bedding Material for Riprap 99 CY $35 $3,465 <br /> Riprap 221 CY $35 $7,735 <br /> 12-in CMP 80 LF $12.00 $960 <br /> Revegetation 1.8 AC $2,300 $4,140 <br />I Total Cost = $65,950 <br /> Basin 4 Clear and Grub 1.0 AC $750 $750 <br />I Excavation 10,520 CY $3.75 $39,450 <br /> Embankment Fill 2,120 CY $3.75 $7,950 <br /> Bedding Material for Riprap 60 CY $35 $2,100 <br />I Riprap 134 CY $35 $4,690 <br /> 12-in CMP 80 LF $12.00 $960 <br /> Revegetation 1.5 AC $2,300 $3,450 <br /> Total Cost = $59,350 <br />I <br />Basin 5 Clear and Grub 0.9 AC $750 $675 <br /> Excavation 8,750 CY $3.75 $32,813 <br />I Embankment Fill 2,120 CY $3.75 $7,950 <br /> Bedding Material for Riprap 61 CY $35 $2,135 <br /> Riprap 137 CY $35 $4,795 <br />I 12-inCMP 80 LF $12.00 $960 <br /> Revegetation 1.4 AC $2,300 $3,220 <br /> Total Cost = $52,548 <br />I <br /> CostEst <br />I 1121198 <br />