Laserfiche WebLink
<br />I <br />'I <br />,. <br />il <br />II <br />:1 <br />il <br />I' <br />il <br />11 <br />II <br />:1 <br />] <br />I <br />il <br />'I <br />,I <br />'I <br />,I <br /> <br />3. Identification of all nearby irrigation facilities which <br />will influence or be influenced by the local drainage. <br /> <br />(b) Sub-basin Description <br /> <br />1. Discussion of historic drainage patterns of the property in <br />question. <br /> <br />2. Discussion of offsite drainage flow patterns and impact on <br />development. <br /> <br />(3) DRAINAGE DESIGN CRITERIA <br /> <br />(a) Development Criteria Reference and Constraints <br /> <br />1. Reference all criteria, master plans, and technical <br />i nformat i on used for report preparati on and des i gn; any <br />deviation from such material shall be discussed and <br />jus tified. <br /> <br />2. Discussion of previous drainage studies (i .e., PDR, <br />drainage basin planning studies, master plans) for the site <br />in question that influence or are influenced by the <br />drainage design and how the plan will affect drainage <br />design for the site. <br /> <br />3. Discussion of the drainage impact of site constraints such <br />as streets, utilities, proposed and existing structures. <br /> <br />(b) Hydrologic Criteria <br />1. Identify design rainfall. <br />2. Identify runoff calculation method. <br />3. Identify design storm recurrence intervals. <br />4. Identify detention discharge and storage calculation <br />method. <br /> <br />(4) DRAINAGE FACILITY DESIGN <br />(a) General Concept <br /> <br />1. Discussion of <br />cons iderations. <br /> <br />comp 1 i ance <br /> <br />with <br /> <br />offsite <br /> <br />runoff <br /> <br />2. Discussion of anticipated and proposed drainage patterns. <br /> <br />4-6 <br />