<br />PREFACE
<br />
<br />Report Acquisition
<br />
<br />This Flood Control and Drainage Plan for Montrose, Colorado was prepared
<br />
<br />Copies of this report are availalbe for public distribution, atanorr.i-
<br />na1 fee, at the offices listed below. A Technical Adden~um to this report
<br />is also available for reviev.' at the sarne~ffices; however, it Ms not been
<br />
<br />under the supervision and direction of the undersigned,whose s eal asa
<br />
<br />Professional Engineer is affixed:
<br />"""\L~""II",,,
<br />,,,,,, OTTA"'f4;,
<br />d':'~<;"'.''''';''o'i'~
<br />J:::>~.~t~\Sl.'9;O":J"_
<br />"'ll.' .iJ'e
<br />.:; : ~ ;e
<br />~*~g 14552 ~i*~
<br />- .~ .? -
<br />~<JI'.", $:Offi
<br />%>'.-1'-1', ~,".' 0$
<br />;;"-v,....o,,.c ...~'?',$-
<br />-'1< /( ....... Q"';:'
<br />'04", OF COl.,,,,".$!
<br />'1i1'lur",.",,""\\
<br />
<br />GI~GERY ASSOCIATES, INC.
<br />
<br />published in sufficient quantities for public distribution. The Technical
<br />Addendum includes all pertinent data and calculations used in this report.
<br />
<br />~
<br />, ~<h.L ~c,~~
<br />PurushottamDass, Pli.D" P.E.
<br />Manager. Water Resources Department
<br />
<br />Department ofComrnunity Development
<br />City of Montrose
<br />433 South 1st Street
<br />Montrose, Colorado 81401
<br />
<br />The following ~ployees of Gingery Associates, Inc. contributed to the
<br />preparation of this report:
<br />
<br />Dr. Purushottam Dass
<br />Ronald l. lambert
<br />David D. Clement
<br />Hank Gonzales
<br />OOugGray
<br />Teresa Abeyta
<br />
<br />Project Director
<br />Project Manager
<br />Project Engineer
<br />Technician/Draftsman
<br />T~chnician/Draftsm~n
<br />Technical Typist
<br />
<br />Colorado Water Conservation Board
<br />823 State Centennial Building
<br />1313 Sherman Street
<br />Denver, Colorado BD2D3
<br />
<br />Acknowledqement<;
<br />The assistance and cooper~tion of ilgencies, firms and organizations 1 isted
<br />below in supplying information and materials is appreciated and gratefully
<br />acknowledged. The Technical Comitteewashelpful in providing coordination
<br />and guidance from the sponsoring entities.
<br />
<br />Technical Committee:
<br />-----------"---.--.
<br />
<br />Frdnk Me~drjc, Building Inspector, Ci ty of Montrose
<br />Roger Shores, City Planner, City of Montrose
<br />Chuck Linguin, City Engineer, City of Montrose
<br />Wi 11 i am P. S ta nto n, Sen i or ~ja ter Resources En gi neer, Colorado
<br />WaterCol1servationBoard
<br />Larry Lang, Chief of Flood Control dnd Conservation Section,
<br />Colorado Water Conservation Bo~rd
<br />
<br />The City of Montrose. in ;Jartlcular Mike SerN. lmp~ct Coordin~tor.
<br />CO:':Tl1unityDevelopmentDepartrrent
<br />Montrose County, Colorado, in particular Joe Dearing. Montrose
<br />County Planner
<br />I-lydro-Triadltd.. innarticularWilliamMathews
<br />
<br />"
<br />c
<br />
<br />.1.
<br />
|